Similar Projects
PBC Convention Center - Fire System Detectors (Only) Replacement
Term Contract
Bidding
Less than $250,000 est. value
West Palm Beach, FL 33401

Administrative Services Fire Alarm System Replacement
Bidding
$611,400 est. value
Orlando, FL 32801

Fire Alarm Upgrades
Sub-Bidding
Tallahassee, FL 32310

911 Back-Up Communication Center - Fire Suppression
Post-Bid
Ocala, FL 34471

Radiant Energy - Sensing Fire Detection Systems
Post-Bid
Panama City, FL

Design Build Services for Fire Stations 36, 64 and 65
Results
Jacksonville, FL

69--Surface Fire Fighting Trainer Smoke/Fog Generation System
Results
Mayport, FL - Newport, RI - Norfolk, VA

NASKW West Fire Pumping Station
Bidding
$634,000 est. value
Key West, FL

Fire Extinguisher and Hood Suppression Services, Multi-Year Contract
Term Contract
Post-Bid
Tarpon Springs, FL 34689

N--Services: Fire Sprinklers with Installation
Results
Gainesville, FL 32608

Fire Alarm Renovation at Sun ‘N Lake Elementary School
Bidding
Sebring, FL 33872

Annual Contract for Fire Alarm Repair and Replacement
Term Contract
Post-Bid
Less than $100,000 est. value
West Palm Beach, FL 33411

Fire Alarm and Intercom Components
Results
FL

Fire Pumping System Replacement
Bidding
Tampa, FL 33619

AASF #1 Cecil Field AFFF Fire Suppression System Conversion Hangar 860
Post-Bid
Jacksonville, FL 32221

Last Updated 04/08/2020 03:58 PM
Project Title

Fire Sprinkler System Updates at RP Funding Center Youkey Theater

Physical Address View project details and contacts
City, State (County) Lakeland, FL 33801   (Polk County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $293,006
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Fire sprinkler system contractors for modification of the existing fire sprinkler system in the basement and back of house areas of the youkey theater, as well as a new fire sprinkler system for the theater itself. The project is to be split in different work phases in order to minimize downtime for the existing system and minimize intrusion during the ongoing theater performance season for the occupied theater. The contractor shall provide without limitation, all labor, materials, equipment, and supervision to perform the work

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents