Similar Projects
Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Region 4 Indefinite Delivery/Indefinite Quantity (Idiq), Multiple Award Task Order Contracts (Matoc), For Construction Services In The States of Tennessee and Kentucky
New Construction
Design
$250,000 to $50,000,000 est. value

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

Secure Construction SATOC
Post-Bid
$100,000,000 est. value
Washington, DC

Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Design Bid Build Construction Services Within The Louisville Districts Area of Responsibility
Results
$45,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

Tennessee/Kentucky General Construction IDIQ
Post-Bid

D/B Southeast MATOC - Phase 2
Results
$1,000,000 to $170,000,000 est. value

Sources Sought for Job Opportunity Construction Contracts
New Construction
Post-Bid
$2,000 est. value

D/B Northeast MATOC
Results
$1,000,000 to $250,000,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Access Control Point Program Design Build II -- RFI(2)
Results

Region 4 Indefinite Delivery/Indefinite Quantity (IDIQ), Multiple Award Task Order Contracts (MATOC), for Construction Services in the States of Tennessee and Kentucky
New Construction
Post-Bid

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Results
$250,000 to $5,000,000 est. value

ERSC MATOC
Post-Bid
$100,000 to $90,000,000 est. value

Reported 03/19/2022 12:00 AM
Project Title

Speculative Building Fit-Up for Pennington Stave Company

Physical Address View project details and contacts
City, State (County) Edmonton, KY 42129   (Metcalfe County)
Category(s) Government/Public, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Misc. Buildings
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of construction of the Speculative Building Fit-up for the Pennington Stave Company.

Details

Misc. Buildings, 1 Story Above Grade, 30,000 SF New Construction, Building.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Loading Dock Equipment.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents