Similar Projects
Fire Station
New Construction - 6,584 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Hampstead, NC 28443

CMPD South Division Station Construction Manager at Risk
- 16,500 SF
Post-Bid
Charlotte, NC

Pre-Construction And Construction Management Services - Fire Stations And EMS Stations
New Construction
Post-Bid
Burgaw, NC 28485

SOF Tactical Equipment Maintenance Facility PN 79453
- 52,200 SF
Results
$10,000,000 to $25,000,000 est. value
Fort Bragg, NC

Architect/Engineer Services for Nationwide Air Force Reserve Projects, and Other Military Projects Primarily within the Great Lakes and Ohio River Division Mission Boundaries
Results
$3,000,000 to $50,000,000 est. value

Plant Sciences Building
New Construction - 184,815 SF
Construction
Less than $160,200,000 est. value
Raleigh, NC

Crooked Creek VFD
New Construction
Construction
Old Fort, NC

Albemarle Police Department
Renovation
Post-Bid
Albemarle, NC 28001

Fire Station #6
New Construction - 22,122 SF
Results
Salisbury, NC

New Granville County Law Enforcement and Detention Center and Animal Shelter
New Construction - 90,500 SF
Construction
Less than $25,980,676 est. value
Oxford, NC

Winnabow Volunteer Fire Station 6
New Construction - 15,600 SF
Post-Bid
$4,035,000 to $5,135,000 est. value
Winnabow, NC 28479

Soabar Street Police Renovations
Renovation
Results
Greensboro, NC

Central Police Station Evidence Storage Building Addition and Fire Station 4 Improvements
Construction
Goldsboro, NC

PN 79439 SOF Advanced Skills Training Facility Annex and HAZMAT Facilities, Ft Bragg, NC
- 1,200 SF
Post-Bid
$10,000,000 to $25,000,000 est. value
Fort Bragg, NC 28310

Donnie E. and Linda V. Lassiter Fire Tower
Results
Smithfield, NC

Last Updated 11/05/2019 07:34 AM
Project Title

Fire Station No. 9

Physical Address View project details and contacts
City, State (County) Cary, NC 27513   (Wake County)
Category(s) Government/Public, Green Building
Sub-Category(s) Fire/Police Station, LEED Certified
Contracting Method
Project Status Construction Commenced October 2018, Construction Completion Expected June 2020
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project consists of a new 2-story, 3-bay fire station with 17,597 sf of floor space for the Town of Cary, NC. This project is a "Green Build" and incorporates many LEED strategies. The structure will consist of a combination of load bearing masonry and a steel frame. The exterior skin consists of brick, aluminum composite metal panels, and storefront and curtainwall systems. Roofing consists of a white PVC membrane roof system. Site work includes heavy duty concrete paving, onsite generator, and utility work.
Details 1 Fire/Police Station, 2 Stories Above Grade, 17,597 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents