Similar Projects
Phase 1 - Tower Terrace Road W/O Barnsley to Alburnett Road Grading and Drainage
Conception
$4,400,000 est. value
Cedar Rapids, IA 52407

USACE UPRR Culverts CC
Conception
$5,000,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management, Reach 3, 12th Avenue SE Road Closure & CRANDIC Railroad Closure
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Cedar Rapids, IA

Saylorville Shoreline Erosion Protection Project
Term Contract
Design
Johnston, IA 50131

RCB Culvert Replacement - Twin Box
Infrastructure
Bidding
IA

Pipe Culverts - River Road
Infrastructure
Bidding
IA

Jones Street Culvert Installation
Infrastructure
Post-Bid
$110,000 est. value
Shellsburg, IA

Upper Wapsipinicon WMA - Phase 6 Watershed Improvements
Infrastructure
Post-Bid
IA

Jesup Drainage Ditch
Results
$153,885 est. value
Jesup, IA

Jesup CSD Drainage Improvements
Results
$86,500 est. value
Jesup, IA 50648

USACE McLoud Run LWR CC
Conception
$2,500,000 est. value
Cedar Rapids, IA

Salvage and Removal - U.S. 18
Infrastructure
Bidding
Charles City, IA 50616

Riverfront/Downtown Revitalization
Renovation, Infrastructure
Post-Bid
$17,655,000 est. value
Burlington, IA

Cedar Lane Culvert Replacements
Results
$431,000 est. value
Waverly, IA

Phase 3 - Tower Terrace Road from C Avenue to W/O Barnsley Lane Grading and Drainage
Conception
$2,100,000 est. value
Cedar Rapids, IA 52407

Last Updated 12/17/2021 10:39 AM
Project Title

Union Co Three Mile Lake Restoration Phase 1

Physical Address View project details and contacts
City, State (County) Afton, IA 50830   (Union County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $373,289
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide for the Construction and completion of every detail of the work described therein. It shall be understood that the contractor shall furnish all labor, material, tools, transportation, and suppliers required for all or any part of the work to make each item complete in accordance with the spirit of the contract. It is understood that the apparent silence of the specifications as to any detail or the apparent omission of a detailed description concerning any point shall be regarded as meaning of the first quality are to be used.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents