Similar Projects
Last Updated | 10/11/2022 08:20 AM |
Project Title | Sellery Hall Exterior Envelope Maintenance - GPC |
Physical Address | View project details and contacts |
City, State (County) | Madison, WI 53706 (Dane County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $554,500 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In general the work consists of replacement of sealant joints between precast concrete components as well as between precast components and brick masonry on floors 2-10. The entirety of the precast and masonry components shall be cleaned on floors 2-10 upon completion of sealant replacement. A separate project may be ongoing in which coordination efforts shall be taken to ensure the smooth operation for both projects. This project shall tie-in as seamlessly as possible to exterior sealant work completed by separate contractor on the 1st and 11th 48 floors of the building as part of other project. Representatives from the A/Es office will be available to take questions for answer in addendum. Prospective bidders are asked to familiarize themselves with the project documents and requirements prior to the conference and walkthrough. Contractors are asked to park in a nearby parking ramp or street parking. On-site contacts are as follows: Adam Rittel Project and Safety / Loss Coordinator Associate Director - Capital Projects UW-Madison, Division of Housing Phone: (608) 262-6702 No deposit is required to obtain documents for bidding purposes. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. A bank certified check or a cashiers check may accompany each bid as a guarantee pursuant to Wis. Stat. s. 779.14(1m)(c)2.b. and 779.14(1s). Failure to enter into the contract with the state (including failure to obtain certificate of insurance and separate 100% performance and 100% payment bonds) may result in forfeiture of the Bid Bond. The company issuing the Bonds must be licensed to do business in Wisconsin. In awarding construction contracts, the Department of Administration shall attempt to ensure that 5 percent of the total amount expended in each fiscal year is awarded to contractors which are minority businesses, as defined under Wis. Stat. s. 16.75(3m)(a). The General Prime Contractor Bidder shall make every effort to award a minimum of 15% of the work to minority business enterprises (MBE) involvement for all projects within 60 mile radius of Milwaukee and 5% for projects located elsewhere. May 2023 - June 2023 - Mobilization May 2023 - August 2023 - Exterior Rehabilitation August 2023 - September 2023 - Substantial Completion |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |