Similar Projects
Greendale Road Residential
New Construction
Conception
$4,500,000 est. value
Vestavia Hills, AL 35243

Hallmark Property Development - Warrior
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Warrior, AL 35180

The Star Uptown / Carraway Hospital Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Design
$300,000,000 CJ est. value
Birmingham, AL 35234

The Star Uptown / Carraway Hospital Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Design
$300,000,000 CJ est. value
Birmingham, AL 35234

Kimberly Senior Center Renovation Project
Addition, Demolition, Infrastructure, Renovation
Bidding
$300,000 CJ est. value
Kimberly, AL 35091

Village Creek Water Reclamation Facility Reliability and Biological Improvements - Phase 3
Renovation, Infrastructure
Bidding
$34,060,000 CJ est. value
Birmingham, AL 35224

Housing Rehabilitation Services
Renovation
Post-Bid
Bessemer, AL

Repair of Five Water Damaged Units at Tuxedo Terrace
Renovation
Post-Bid
Birmingham, AL 35208

Ruffner Park Revitalization Phase I
Infrastructure
Results
Irondale, AL 35210

CRGP Housing Rehabilitation
Renovation
Results
Birmingham, AL

Alamo Drafthouse Cinema
New Construction, Infrastructure - 50,000 SF
Construction
$10,000,000 CJ est. value
Birmingham, AL 35233

The Bray
New Construction
Pending Verification
Vestavia Hills, AL 35242

Samford University Recreation Center and Athletic Complex
New Construction, Infrastructure - 154,000 SF
Pending Verification
$30,000,000 CJ est. value
Birmingham, AL 35229

1707 Reese Street Mixed Use
New Construction, Infrastructure
Conception
$4,000,000 CJ est. value
Homewood, AL 35209

Green Meadows f/k/a Multi-Use Project
New Construction
Design
$100,000,000 est. value
Bessemer, AL 35022

Last Updated 10/27/2022 05:11 PM
Project Title

Friendly Estates (Woodmeadow Subdivision)

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35216   (Jefferson County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Preliminary Plat will be presented to the Hoover Planning commission September 12, 2022. Information regarding home builder has yet to be determined. Although a firm timeline has yet to be announced, construction is estimated to begin in 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents