Similar Projects
Building One And Four Air Conditioning Installation GPC
Infrastructure, Alteration
Bidding
$1,247,800 est. value
Madison, WI 53704

Environmental Health and Safety Central Utility Connections - GPC
Alteration
Bidding
$1,350,000 est. value
Madison, WI 53715

MMHI-21-11 Powerplant Chiller Repair and Service
Term Contract
Post-Bid
Less than $50,000 est. value
Madison, WI 53704

Refrigerant Monitoring System Replacement
Post-Bid
Less than $150,000 est. value
Madison, WI

911 Center Data Room Backup Cooling
Results
Madison, WI 53703

HVAC Upgrade
Results
Less than $225,000 est. value
Madison, WI 53593

Environmental Health and Safety Central Utility Connections - MEP
Alteration
Bidding
$1,350,000 est. value
Madison, WI 53715

HVAC and Mechanical Products
Term Contract
Post-Bid

Utility Renovations - Mechanical
Results
Less than $3,000,000 est. value
Madison, WI 53703

Beloit Wwtf Biosolids Drying, Uv Disinfection And Wpcf Upgrades
Infrastructure
Bidding
Beloit, WI

NWHC Replacement of Air Handling Unit - FS-06
Post-Bid
Madison, WI

Heim Building AC Replacement
Results
Madison, WI 53713

Building One And Four Air Conditioning Installation MEP
Infrastructure
Bidding
Madison, WI 53704

Supply, Delivery and Incidental Install of LP Gas Heated Pressure Washers for the Nine Federal Flood Risk Management Structures (Fox River Dams), Wisconsin
Post-Bid

HVAC Improvements
Results
$203,000 est. value
Madison, WI

Last Updated 02/09/2022 02:16 PM
Project Title

2022 Library Rooftop Unit Replacement

Physical Address View project details and contacts
City, State (County) Monona, WI   (Dane County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Replacement of two rooftop mounted air handling units, roof curb modifications, interior ductwork modifications, and replacement of the variable air volume unit controllers associated with RTU 5. A bid alternative will be included to replace two additional rooftop units and the associated roof curb and interior ductwork modifications.

Details

Division 07 - Thermal and Moisture Protection.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents