Similar Projects
Groundwater Ultraviolet Disinfection Facility - 09-RWS-19 - City of Casper
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
Casper, WY 82601

N. Poplar Street Storm Sewer Improvements - Phase 1 - 18-Storm-02 - City of Casper
Infrastructure
Conception
$866,000 CJ est. value
Casper, WY 82601

Poplar Street between CY and Collins Drive - City of Casper
Infrastructure
Design
$1,200,000 CJ est. value
Casper, WY 82601

WYO Complex Indoor Sports Facility
New Construction, Infrastructure - 130,720 SF
Design
$31,000,000 CJ est. value
Casper, WY 82601

Casper Streets (Poplar St, W. Collins Dr - Yellowstone Hwy)
Infrastructure
Bidding
$300,000 CJ est. value
Casper, WY 82601

Casper Streets (Poplar St, W. Collins Dr - Yellowstone Hwy)
Infrastructure
Bidding
$300,000 CJ est. value
Casper, WY 82601

Installation of New Parking Lot Lighting and Enhancement of Current Building Lighting; Air Traffic Control Tower
Infrastructure
Post-Bid
$60,000 CJ est. value
Casper, WY 82604

CPR 070 Rehabilitate Runway 8-26
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Casper, WY 82604

Waltman - Shoshoni
Infrastructure
Results
$200,000 est. value
Belle Fourche, SD 57717

2nd and Lincoln Paving Improvements
Infrastructure
Results
$250,000 est. value
Casper, WY 82605

Natrona County School District Tennis Complex - Early Bid Packages
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Casper, WY 82601

Natrona County School District Tennis Courts Complex
New Construction, Renovation, Infrastructure
Construction
$3,750,000 CJ est. value
Casper, WY 82601

Dinosolar Solar Energy System
Infrastructure
Pending Verification
$266,617,340 CJ est. value
Casper, WY 82604

Mountain Acres
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Casper, WY 82601

Washington Field Lights Replacement - 1019021003 - City of Casper
Infrastructure
Conception
$346,000 CJ est. value
Casper, WY 82601

Last Updated 09/09/2023 06:38 AM
Project Title

Midwest Avenue Reconstruction Poplar Street to Walnut Street Project

Physical Address View project details and contacts
City, State (County) Casper, WY 82601   (Natrona County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $3,394,750 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 18, 2023, project is on hold. No definite date for the rebid. Midwest Avenue Reconstruction Poplar Street to Walnut Street Project No. 21-079 Description of Work: Removal of existing surfacing, removal and installation of storm sewer, replacement of water main and sanitary sewer manholes, removal and replacement of fire hydrants, placing surfacing, bike path, installation of an irrigation system, installation of streetscape, installation of pedestrian and roadway lighting, installation of striping and signs, and other miscellaneous work along Midwest Ave. from Poplar St. to Walnut St. The City of Casper, Wyoming, reserves the right to reject any or all bids and to waive any informalities or technicalities in the bidding; provided, however, that any bid received after the time specified or without accompanying Bid Guaranty, as stated below, will not be considered. submit a Cashier's Check for not less than 5% of the total base bid amount.) The Work will be substantially completed by September 18, 2024; Final completion- October 16, 2024.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents