Similar Projects
Elevator Upgrades at City Hall Annex
Renovation
Bidding
Yonkers, NY 10701

Partial 4th Floor Interior and Associated Asbestos Abatement
Renovation - 18,000 SF
Bidding
$2,500,000 to $3,000,000 est. value
Bronx, NY

Fulton Highway Garage and Town Hall Renovation
Renovation - 19,440 SF
Post-Bid
Fulton, NY

Installation of Accessible Lift for the Town Hall
Post-Bid
$75,000 to $85,000 est. value
Schroon Lake, NY 12870

Construction of a Court Building on the Milan Town Hall Property
Results
Milan, NY

Court Room and Justice Court Office Renovation
Renovation
Results
Rensselaer, NY

Hall of Justice Courtroom Improvements
Construction
Rochester, NY 14614

Village Hall Renovations
Renovation
Bidding
Ballston Spa, NY 12020

Village Hall Renovations
Renovation
Post-Bid
Grand View-on-Hudson, NY 10960

Westport Town Hall Upgrades
Results
Westport, NY

Construction of a New Administration/Courthouse Building
New Construction
Post-Bid
Marcellus, NY 13108

Second Floor Renovations and HVAC Renovations
Renovation
Results
Waterford, NY 12188

Pirnie Fire Alarm Construction
- 93,646 SF
Post-Bid
$500,000 to $1,000,000 est. value
Utica, NY 13501

ADA Bathroom, Ramps and Doors
Results
Tuxedo Park, NY 10987

Village Hall Elevator Modernization
Renovation
Post-Bid
Scarsdale, NY 10583

Last Updated 09/08/2021 08:22 AM
Project Title

Town Hall Interior Renovations

Physical Address View project details and contacts
City, State (County) Ballston Spa, NY   (Saratoga County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No. 1 - Construction Contract Contract No. 2 - Plumbing Contract Contract No. 3 - HVAC Contract Contract No. 4 - Electrical Contract Contract No. 1 - Construction Contract generally includes interior finish replacements including resilient tile flooring, ceiling systems, framing, drywall, and finish carpentry. The work also includes the installation of a new sewer lateral and packaged grinder pump system. Contract No. 2 - Plumbing Contract generally includes the replacement of interior plumbing systems, including domestic water piping, fixtures, and sanitary sewer piping. Contract No. 3 - HVAC Contract generally includes the replacement of building furnaces, air condensing units, hydronic piping, ductwork and accessories. Contract No. 4 - Electrical Contract generally includes electric cabling, conduit, receptacles, communications cabling, fire alarm system and security systems and accessories.

Details

Capitol/Court House/City Hall, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents