Similar Projects
LA 23 Raising at Lareussite Levee
Infrastructure
Design
$1,000,000 CJ est. value
Port Sulphur, LA 70083

LA 23 Raising at Lareussite Levee
Infrastructure
Design
$1,000,000 CJ est. value
Port Sulphur, LA 70083

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Oilfield Site Restoration - Lake Washington and Bay Baptiste Fields in Plaquemines
Infrastructure
Post-Bid
LA

Dr 4263 Pw 910 Paved Roads - Task Order No. 4
Infrastructure
Results
$4,500,000 est. value

Mill and Overlay Various Locations Along Roadway
Infrastructure
Results
$250,000 to $500,000 est. value
LA

Mid-Barataria Sediment Diversion Project
Infrastructure
Pending Verification
$2,000,000,000 CJ est. value
Pointe A la Hache, LA 70082

Mid-Barataria Sediment Diversion Project
Infrastructure
Pending Verification
$2,000,000,000 CJ est. value
Pointe A la Hache, LA 70082

Walker Road Solid Waste Transfer Station
New Construction, Infrastructure
Design
$2,623,866 CJ est. value
Belle Chasse, LA 70037

Rehabilitation of several existing roads in Washington Parish
Infrastructure
Post-Bid

2022 District 12, 13, 14 Road Improvements
Infrastructure
Results
$1,366,416 est. value

LA 23: Russell Dr - W Walker Rd
Infrastructure
Design
$7,500,000 CJ est. value
Port Sulphur, LA 70083

Pre-position Emergency Contract for Levee Maintenance and Emergency Access Roads
Infrastructure
Post-Bid
Belle Chasse, LA

2022 District 7, 9 Road Improvements
Infrastructure
Results
$1,797,697 est. value

LA 39 at Guerra Dr
Infrastructure
Design
$500,000 CJ est. value
Braithwaite, LA 70040

Last Updated 01/12/2023 04:07 PM
Project Title

Plaquemines Port Harbor and Terminal District

Physical Address View project details and contacts
City, State (County) Belle Chasse, LA 70037   (Plaquemines County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Aircraft Hangar, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Seeking Site Plan Approvals, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,500,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 13, 2022, the project is in the planning stages. The project is in the process of obtaining a few more approvals from Plaquemines Port Authority. A design/builder has been selected but not released. A firm construction timeline has not been confirmed.

Details

Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents