Similar Projects
Polk-Quincy - 701048.0 - City of Topeka
Infrastructure
Conception
$7,000,000 est. value
Topeka, KS

South Kansas Avenue(4th to 6th Avenue) - 841095 - City of Topeka
Alteration
Conception
$892,045 est. value
Topeka, KS 66630

Topeka Regional Business Center - Bldg. 612 Drainage Improvements
Infrastructure
Design
$100,000 CJ est. value
Topeka, KS 66612

Topeka Regional Business Center - Bldg. 612 Drainage Improvements
Infrastructure
Design
$100,000 CJ est. value
Topeka, KS 66612

South West 21st Street Water Main Replacement Project
Infrastructure
Bidding
$500,000 CJ est. value
Topeka, KS 66614

South West 21st Street Water Main Replacement Project
Infrastructure
Bidding
$500,000 CJ est. value
Topeka, KS 66614

14th Street Improvements
Infrastructure
Post-Bid
Auburn, KS

Forbes Aircraft Ramp Repair, Topeka Kansas
Infrastructure
Post-Bid
$10,000,000 to $25,000,000 est. value
Topeka, KS 66619

Micro-Surfacing 2021
Infrastructure
Results
Topeka, KS

2021 City Wide Temporary Cap Replacement
Infrastructure, Alteration
Results
Topeka, KS

Replacing the Bridge on SW 61st Street Over Six-Mile Creek
Demolition, New Construction, Infrastructure
Construction
$863,802 CJ est. value
Topeka, KS 66610

Replacing the Bridge on SW 61st Street Over Six-Mile Creek
Demolition, New Construction, Infrastructure
Construction
$863,802 CJ est. value
Topeka, KS 66610

South Topeka Boulevard from 15th to 21st - 701045 - City of Topeka
Infrastructure
Conception
$4,700,000 est. value
Topeka, KS 66630

Topeka Regional Business Center - Building 621 and 623 Drainage Improvements
Infrastructure
Design
$100,000 CJ est. value
Topeka, KS 66612

Construct New Terminal Philip Billard Municipal Airport
New Construction, Infrastructure
Bidding
$3,800,000 CJ est. value
Topeka, KS 66616

Last Updated 08/29/2022 10:10 AM
Project Title

2022 Metropolitan Topeka Airport Authority Pavement Repair Program

Physical Address View project details and contacts
City, State (County) Topeka, KS 66612   (Shawnee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $260,260 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Cost Estimate: $100,000-$150,000 For furnishing all labor, materials and equipment and performing all work necessary for 2022 MTAA Pavement Repair Program at Topeka Regional Airport and Business Center and Philip Billard Municipal Airport, Topeka, Kansas. A. Concrete remove and replace - Clean saw cut full depth, remove and haul away existing deteriorated concrete pavement. Furnish and install a 6" thick 4000 PSI concrete pavement. Backfill with black dirt and seed any areas (no mulch) that are in contact with grass. B. Asphalt remove and replace - Saw cut or mill existing asphalt to the depth of the associated bid items. Haul away existing deteriorated asphalt. Asphalt Mix - KDOT Commercial Grade (Class A). Tack oil to be placed between lifts. Joint seal and striping by others. C. All pavements shall be graded to provide positive drainage for the new pavement surfaces. New pavement surfaces shall be adequately sloped to provide for storm water drainage and also be free of water ponding locations. The anticipated date that project work may commence is established as August 15, 2022. The owner has established a contract substantially completion date of September 16, 2022 with a project completion date of September 30, 2022. All project work shall be substantially completed within the stated timeframe. Once work has commenced on the pavement repair program, the contactor shall complete all project activities with a 3 week (21 calendar days) period. Each proposal must be accompanied by a bid guarantee in the amount of five (5) percent of the total amount of the bid. The bid guarantee may be by certified check or bid bond made payable to Metropolitan Topeka Airport Authority. The successful bidder will be required to furnish separate performance and payment bonds each in the amount equal to 100% of the contract price at the time of contract execution.. All proposals submitted in accordance with the instructions presented herein will be subject to evaluation. Bids may be held by the Metropolitan Topeka Airport Authority for a period not to exceed thirty (30) days from the date of the bid opening for the purpose of evaluating bids prior to award of contract. Project work items shall be in compliance with the CITY OF TOPEKA AND SHAWNEE COUNTY STANDARD TECHNICAL SPECIFICATIONS, 2016. The right is reserved, as the Metropolitan Topeka Airport Authority may require, to reject any and all bids and to waive any informality in the bids received. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents