Similar Projects
Marymoor Stormwater Facility
New Construction
Conception
$900,000 est. value
WA

Vegetation Sorting Facility - sdbd12 - City of Auburn
Build-out
Conception
$152,000 CJ est. value
Auburn, WA 98002

Lake Hills Interceptor Corrosion Rehabilitation
Renovation
Design
$19,000,000 est. value
WA

South Plant Dewatering and Truck Loading Bay Ventilation Improvements
Renovation
Design
$1,300,000 est. value
WA

RFP Construction Manager - GC/CM Services for West Point Treatment Plant (WPTP)
New Construction, Infrastructure
Bidding
$7,000,000 CJ est. value
Seattle, WA 98199

Civil Structural Construction Work Order 2021-2022
New Construction
Post-Bid
$3,000,000 est. value
Seattle, WA

West Point Treatment Plant Capital Program Construction Work Order
New Construction
Post-Bid
$15,000,000 est. value
Seattle, WA

Interbay Forcemain and Odor Control Project
Renovation
Results
$1,100,000 est. value
WA

NE Spring Boulevard - 130th Ave NE to 132nd Ave NE
Renovation, Alteration
Results
$6,000,000 to $6,500,000 est. value
Bellevue, WA 98007

South Wellfield Improvement Project - City Of Snoqualmie
Renovation, Infrastructure
Conception
$1,745,011 CJ est. value
Snoqualmie, WA 98065

Cedar Hills Leachate Lagoon- Lagoon Upgrade
Renovation
Design
$3,500,000 est. value
WA

CM Services for the WPTP Raw Sewage Pump Replacement Project
New Construction
Post-Bid
$300,000 est. value
WA

MBR Equipment for Train 4
Renovation
Results
Duvall, WA 98019

Grit Removal System Improvement Project - City Of Snoqualmie
Renovation
Conception
$326,590 CJ est. value
Snoqualmie, WA 98065

West Point Treatment Plant Primary Sedimentation Tank Coating
Renovation
Design
$3,700,000 est. value
WA

Last Updated 02/06/2023 07:07 PM
Project Title

Sewer Train Upgrades and UV Replacements - City of Duvall

Physical Address View project details and contacts
City, State (County) Duvall, WA 98019   (King County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $5,717,850 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sewer Train Upgrades and UV Replacement for Duvall's Waste Water Treatment Plant (WWTP). The city is in design to increase the city's process capacity at the WWTP. The WWTP is preparing for an upgrade to increase the process capacity. We will be adding an entire process train to accommodate growth. This was planned for in 2004 when the WWTP had its last upgrade. We will increase capacity, update the biosolids handling and replace the 25 year of Ultra Violet (UV) light disinfection system. This project is included in the City of Duvall's FY 2023-2024 Capital Improvement Plan (CIP). As of February 6, 2023, a design team and general contractor have been selected. Owner states that construction is not anticipated to begin until May 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents