Similar Projects
Floating Dock Materials – Danbury Fire Department
Bidding
Danbury, CT

Replace/Repair Dock System at Marina
Post-Bid
Danbury, CT 06812

Design-Bid-Build, P1097 Relocate Underwater Electromagnetic Measurement System
Post-Bid
$1,000,000 to $5,000,000 est. value
New London, CT

Marine Construction and Maintenance Service
Term Contract
Results
Greenwich, CT

Annual Servicing of Anchorage Markers and Dock Floats
Results
Essex, CT

Ferry Slip
Construction
New London, CT

Nautilus Pier Water Taxi Dock
Post-Bid
Groton, CT 06340

P898, Replace Pier 32 at NAVSUBASE New London, CT
New Construction, Demolition
Results
$25,000,000 to $100,000,000 est. value
Groton, New London, CT 06340

Branford Point Seawall and Wharf Repair
Post-Bid
Branford, CT

New London Waterfront Repairs and Maintenance
Results
New London, CT

Design, Fabrication and Installation Services for Baldwin Bridge State Boat Launch Floating Dock Systems
Post-Bid
Old Saybrook, CT 06475

Marine Inspection and Repair Services
Term Contract
Results
Groton, CT

New Business Venture - Waterfront Promenade
Post-Bid
New London, CT

Thames River Marina Dock Removal Project
Results
Waterford, CT 06385

Construction Manager at-Risk (CMR) for Infrastructure Improvements to Connecticut State Pier
Results
New London, CT 06475

Reported 12/04/2019 12:00 AM
Project Title

Z--Design-Build Nautilus Pier Water Taxi Dock, NAVSUBASE New London, CT

Physical Address View project details and contacts
City, State (County) Groton, CT 06349   (New London County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Design-Build Nautilus Pier Water Taxi Dock, NAVSUBASE New London, CT: Contractor shall design, provide, and install a floating pier with an attached landing platform and an accessible gangway that connects existing fixed pier that services the Historic Ship NAUTILUS (SSN 571) to a new floating pier. The floating pier shall be anchored with a minimum of four (4) cantilever steel pipe piles. The new floating pier and gangway shall have electrical lighting, handrails, and a 6ft swing gates at the top of the gangway. Set Aside: The contractors that can only supply a proposal are on the MIDATLANTIC MACC: N4008518D1156; N4008518D1157; N4008518D1158; N4008518D1159 and N4008518D1160.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents