Similar Projects
Munson Road Improvements - Phase VII
Infrastructure
Design
$458,000 CJ est. value
Orono, ME 04473

Munson Road Improvements - Phase VII
Infrastructure
Design
$458,000 CJ est. value
Orono, ME 04473

Domestic Terminal Gate 4 Passenger Boarding Bridge
Infrastructure
Bidding
$50,000 CJ est. value
Bangor, ME 04401

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Pavement 2021 Project
Infrastructure
Post-Bid
Brewer, ME

Pavement Milling, Hot Mix Asphalt Overlay, Ultra - Thin Bonded Wearing Course with Drainage and Safety Improvements
Results
Less than $4,403,000 est. value
Medway, ME

Placement of Plant Mix Recycled Asphalt Pavement, Hot Mix Asphalt Overlay, Drainage, Safety Improvements and Intersection Improvements
Results
$1,600,000 est. value
Hampden, Newburgh, ME

Large Culvert Replacement - Patten - Region 5
Infrastructure
Construction
$484,482 CJ est. value
Patten, ME 04765

Large Culvert Replacement - Patten - Region 5
Infrastructure
Construction
$484,482 CJ est. value
Patten, ME 04765

Nautilus Data Center / Millinocket
New Construction, Infrastructure
Pending Verification
$300,000,000 CJ est. value
Millinocket, ME 04462

Tyler Technologies Inc Office / Orono
Demolition, New Construction, Infrastructure - 14,933 SF
Pending Verification
$3,000,000 CJ est. value
Orono, ME 04473

Paving
Infrastructure
Post-Bid
Medway, ME 04460

Hot Mix Bituminous Asphalt Pavement
Results
Hampden, ME

Levinson Center Paving Project
Infrastructure
Post-Bid
Bangor, ME 04401

Munson Road Improvements, Phase VI
Results
Orono, ME 04473

Last Updated 11/29/2022 01:17 PM
Project Title

County Road Dirt Rehab

Physical Address View project details and contacts
City, State (County) Milford, ME 04461   (Penobscot County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $423,718 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of November 29, 2022, the project has not yet been awarded. The anticipated date for award is not yet determined. County Road Dirt Rehab The Town of Milford is seeking bids for the rehabilitation of the dirt part of County Road. Bid packets can be picked up at the Milford Town Office during regular business hours or requested at townmanager@milfordmaine.org. Please note, the Board of Selectman reserves the right to accept or reject any and all bids. The Town of Milford is seeking bids for the rehabilitation of the dirt part of County Road. This section of road is 21,438' long and 22' wide. Contractor will supply necessary material, equipment, labor to apply 1' thick x 22' wide of 2" minus MDOT Type A gravel rolled to MDOT specifications.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents