Similar Projects
Kwik Trip / Reedsburg
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Reedsburg, WI 53959

CTH G - STH 23 Const / Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$500,000 CJ est. value
Plain, WI 53577

Wisconsin Dells - Baraboo Re - Ops for 6145-01-72
Infrastructure
Design
$250,000 to $500,000 est. value
Baraboo, WI

J's Pub and Grill - Outside Addition
Addition, Renovation, Infrastructure
Design
$100,000 CJ est. value
Reedsburg, WI 53959

Schoepp Road Reconditioning Project
Infrastructure
Bidding
$921,991 CJ est. value
Sauk City, WI 53583

Schoepp Road Reconditioning Project
Infrastructure
Bidding
$921,991 CJ est. value
Sauk City, WI 53583

Road Projects for 2022
Infrastructure
Post-Bid
Lyndon Station, Reedsburg, WI 53965

Asphaltic Paving
Infrastructure
Post-Bid
Baraboo, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

City of Reedsburg, K Street, Alexander Avenue to Albert Avenue
Infrastructure
Results
Reedsburg, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Pelton Apartments
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Reedsburg, WI 53959

Baraboo VA Outpatient Clinic
New Construction, Infrastructure - 11,300 SF
Pending Verification
$7,000,000 CJ est. value
Baraboo, WI 53913

Mineral Point - Spring Green Const / Mill and Overlay
Infrastructure
Conception
$3,000,000 CJ est. value
Loganville, WI 53943

Last Updated 04/26/2023 03:10 PM
Project Title

CTH PF Seal Coat Project

Physical Address View project details and contacts
City, State (County) Baraboo, WI 53913   (Sauk County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $528,729 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 04/05/2023 Estimated cost is more than $500,000. In general, this request for bids is for services and equipment involved for complete installation of Seal Coat and Traffic Control as outlined in the documents listed in the table of contents. This Project shall consist of the construction of Seal Coat surfaces shall conform to Section 475 of the State of Wisconsin Department of Transportation Standard Specifications for Road and Bridge Construction, 2023 Edition. Furnish asphaltic materials for seal coat conforming to Section 455 of the state specifications and the aggregates to be used for base, binder and surface course shall conform to the gradation requirements in 460. The location shall be CTH PF from CTH W (East) to USH 12, general characteristics, and principal details of the Work to be performed are specified in the contract specifications entitled: CTH PF Seal Coat Project . It is required that the work to be done under this contract shall be completed by October 31, 2023 but a contract extension shall be at the discretion of the Highway Commissioner. Time is of the essence regarding the completion deadline, and all other deadlines specified herein. Unless a written extension is granted, all work shall be completed by the end of October 2023. Each Bid must be accompanied by a bid security consisting of a BID BOND, CASH, or, CERTIFIED CHECK issued by a responsible bank or trust company in the amount of 10% of the bid price The successful bidder must furnish a 100% Performance Bond and a 100% Payment Bond in the contract sum with a corporate surety approved by the Owner (Sauk County). Selection of the contractor will be based upon bidder qualifications, including but not limited to evidence of past performance in similar projects, and bid price. The contract will be awarded to. the bidder deemed by the awarding authority to be the lowest properly responsive, responsible and eligible bidder. Contractors submitting bids must perform at least 50% of the work outlined in the bid documents. The bidder agrees that its bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays and legal holidays excluded, after the opening of the bids. Sauk County reserves the right to waive any informalities, to accept or reject, in whole or in part any or all bids, or take whatever other action may be deemed to be in the best interest of the County.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents