Similar Projects
Air Conditioner Replacement - Board of Education Offices
Post-Bid
Less than $49,999 est. value
Leonardtown, MD 20650

Air Conditioner Replacement - Board of Education Office Building II
Post-Bid
Less than $49,999 est. value
Leonardtown, MD 20650

On-Call Maintenance Services for Heating Ventilation and Air Conditioning (HVAC)
Results
$100,000 to $500,000 est. value
Hanover, MD 21076

HVAC Services
Results
Leonardtown, MD 20650

Heating and Cooling Valve Replacement - Leonardtown High School
Post-Bid
Less than $49,999 est. value
Leonardtown, MD 20650

Air Conditioner Unit Replacement Board of Education Offices
Term Contract
Results
Leonardtown, MD 20650

HVAC Preventative Maintenance and Repair Service
Term Contract
Post-Bid
California, MD 20619

Natatorium Main Pool HVAC Replacement Project
Results
$2,000,000 to $2,200,000 est. value
Saint Marys City, MD 20686

Chopticon High School Cooling Valve Replacement
Post-Bid
Morganza, MD 20660

Water Chiller Replacement - Town Creek Elementary
Results
Lexington Park, MD 20653

Temporary Cooling Town Creek Elementary School
Results
Lexington Park, MD 20653

Install Air Conditioning in the War Room
Results
Patuxent River, MD 20670

HVAC Control Parts
Results
Loveville, MD 20656

Installation of HVAC Controls
Results
Loveville, MD 20656

Air Conditioner Unit Installation
Results
Less than $49,999 est. value
Mechanicsville, MD 20659

Last Updated 11/02/2020 10:08 AM
Project Title

AHU and Condenser Replacement

Physical Address View project details and contacts
City, State (County) Charlotte Hall, MD 20622   (Saint Marys County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of replacing the existing Air Handling Unit and condenser with new AHU & condenser and associated components of equal, or better capacity and performance characteristics. Units are located in the SMPRU Administration Building Penthouse Mechanical Room & roof. It will be the responsibility of the contractor to verify the exact location of the units and the modifications necessary to fit properly in the available space for a fully functional system without any additional costs to the Owner. The work will also include providing or modifying existing housekeeping pad in which to provide a base for the installation of the new AHU. Removing and replacing all refrigerant piping for the complete refrigeration system to include valves.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents