Similar Projects
Window Treatments
Alteration
Bidding
Glendale, AZ

Sam's Club #4915-227 - CPU INTERIOR SPACE
Renovation
Bidding
Bullhead City, AZ

Damage Restoration Including Window and Mirror Replacement or Repair
Post-Bid
Tucson, AZ

Storefront Glass Doors Maintenance and Repair Services
Post-Bid
Window Rock, AZ

Courthouse Door Lockdown Project
Results
Flagstaff, AZ 86001

Prescott Mile High-Door, Hardware, Window Replacement Project
Results
Prescott, AZ 86303

Owens-Whitney Elementary School Exterior Weatherization
Alteration
Bidding
Wikieup, AZ 85360

Building Glass and Accessories
Post-Bid
Tucson, AZ

Aviation Glass Repair, Replacement, and Maintenance Services
Term Contract
Results
$1,000,000 est. value
Phoenix, AZ 85034

Door Hardware Replacement Project
Alteration
Bidding
Tucson, AZ

BIE WRO Keams Canyon Elementary - Exit Door Replace
Post-Bid
Keams Canyon, AZ 86034

Fire Bay Door Maintenance and Repair
Term Contract
Results
Peoria, AZ 85345

DEMA Window Replacements
Alteration
Bidding
Marana, AZ 85653

Gila Ridge High School Window Remediation
Term Contract
Post-Bid
Yuma, AZ 85364

Door and Window Replacement Project at Beaver Creek Elementary School
Results
Rimrock, AZ 86335

Last Updated 09/15/2021 11:28 AM
Project Title

Carmichael Windows Replacement

Physical Address View project details and contacts
City, State (County) Sierra Vista, AZ 85635   (Cochise County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $141,889
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove existing steel sash and Alum. XO windows from existing hollow metal sub frames. This will require grinding off welds on steel sash window connections to sub-frames and unscrewing and removing existing XO units. 2. Fixed window glazing install will consist of installing new window stops to the interior and exterior side of the Hollow Metal sub-frames and installing 1" tempered insulated units with Guardian high performance Low-E glass AE " Sun Guard SNX 51/23 units. New XO windows units shall be Anderson 100 series fibrex tempered XO units screwed to the sub frames, one in each classroom. 3. You will also install 39 each. new 1 W' X 4" X 50 3/8" long 1/8" steel tube welded to existing sub-frames for glazing supports. This tube steel will also require primer and finish paint, matching existing color. 4. Furnish and install all sealants and glazing per HMMA for a watertight installation. 5. Properly dispose of all demolished materials, daily clean-up required. 6. Bids shall include all taxes. 7. Furnish 2 year warrant for all work.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents