Similar Projects
Roeville Elevated Water Tank - City of Milton
Infrastructure
Conception
$500,000 CJ est. value
Milton, FL 32570

Highway 87 South Forcemain - City of Milton
Infrastructure
Conception
$300,000 CJ est. value
Milton, FL 32570

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Hilton Garden Inn / Pensacola
Addition, Demolition, Infrastructure - 1,800 SF
Design
$500,000 CJ est. value
Pensacola Beach, FL 32561

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

New Entry Drive and Fencing for West Florida Baptist Church
New Construction, Infrastructure - 5,500 SF
Bidding
$850,000 CJ est. value
Milton, FL 32583

Milton Downtown Waterfront Marina, Residential and Mixed-Use Development Opportunity
New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Milton, FL 32570

RFP Engineering - Multilane Design SR 30 (US 98) in Santa Rosa County
Infrastructure
Post-Bid
$4,100,000 CJ est. value
Gulf Breeze, FL 32563

CR 191A Old Bagdad Highway Sidewalk Project
Infrastructure
Results
Milton, FL 32570

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Bridge Repair/Rehabilitation
Infrastructure
Construction
$278,513 CJ est. value
Milton, FL 32583

Oasis Resort and Escape Family Center
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Pensacola Beach, FL 32561

Eglin Federal Credit Union / Gulf Breeze
New Construction, Infrastructure - 4,695 SF
Pending Verification
$1,200,000 CJ est. value
Gulf Breeze, FL 32563

Locklin Lake - Upstream Stormwater Improvements - City of Milton
Infrastructure
Conception
$1,000,000 CJ est. value
Milton, FL 32570

Last Updated 02/16/2023 01:34 AM
Project Title

Restripe Roadway Parking Areas

Physical Address View project details and contacts
City, State (County) Gulf Breeze, FL 32561   (Santa Rosa County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $62,764 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

CYCLIC RESTRIPE FORT PICKENS ROAD AND PARKING LOTS STATEMENT OF WORK: [Attachment 0001]. DBA Wage Determination FL20230165 - HIGHWAY [Attachment 0002] BRIEF DESCRIPTION: Project scope calls out Traffic Paint to re-stripe roadway center and edge lines, bike lane markings, crosswalks, and parking lots to include stop bars, Bus and RV, and directional arrows and symbols for the entire Fort Pickens area. All striping and accessibility space identification shall meet applicable codes and laws as well as ADA-ABAAS standards (Chapter 5: Parking Spaces available online at access-board.gov). NAICS Code: 237310 Painting traffic lanes or parking lots Size Standard: $39.5 in millions of dollars SET-ASIDE: Small Business 100% Estimated Price Range: Between $25,000 and $100,000 Bond: alternative payment protections (SF 25A or ILC) required, penal sum 100% METHOD OF SOLICITATION: Request For Quotations or Offers prepared in accordance with FAR PART 13 - SIMPLIFIED ACQUISITION PROCEDURES and Subpart 36.2 - Special Aspects of Contracting for Construction BASIS OF AWARD: Best Value considering only price and past performance based upon contracting officer's knowledge and or Contractor Performance Assessment Reporting System (CPARS). EXPLANATION TO PROSPECTIVE BIDDERS: Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing ON OR BEFORE noon 31 JAN 2023. 00010 RESTRIPE FORT PICKENS ROAD AND PARKING LOTS Principal work consists of re-striping traffic markings (centerline and edge lines), bike lane markings, crosswalks, and parking lots (stop bars, Bus and RV, and directional arrows) in a manner that conforms to requirements cited in the STATEMENT OF WORK and associated solicitation/contract documents. Period of Performance: 03/15/2022 to 07/14/2023 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents