Similar Projects
Construction of Lincoln Road District Improvements
Post-Bid
Miami Beach, FL

Morgan's Glen Phases 1 and 2 (Site Civil) and Phase 3 (Earthwork)
Post-Bid
Sarasota, FL

Palmetto Park Road from Southwest 7th Avenue to Southwest 5th Avenue
Results
Less than $4,950,000 est. value
FL

Resurfacing Group 17-18
Results
Less than $4,950,000 est. value
FL

AutoNation Vehicle Storage Lot - Parking Area Upgrades
Construction
$750,000 est. value
Orlando, FL 32807

Construction Services for Poitras East Community Development District
Post-Bid
FL

Portland Cement and General Contractor
Results
Less than $14,102,991 est. value
FL

Thompson Valley Road Resurfacing Project
Results
Less than $1,100,000 est. value
Monticello, FL

NE 2nd Way Roadway Improvements
Results
Trenton, FL 32693

Smith Creek Road Widening and Resurfacing Project
Results
Crawfordville, FL 32327

FDOT SCOP 2019 Carter Rd./NE 1st St. Roadway Improvements
Results
Less than $450,000 est. value
Lawtey, FL

Silver Springs Acres Road Grading
Term Contract
Results
Less than $38,000 est. value
FL

CR 236 Widening and Resurfacing
Results
Less than $693,313 est. value
FL

Bayou Drive Shoulder Repair
Results
FL

NW 32nd Ave Resurfacing
Results
Less than $900,000 est. value
FL

Last Updated 07/28/2020 11:58 AM
Project Title

Citation Parkway Improvements

Physical Address View project details and contacts
City, State (County) Palm Coast, FL 32164   (Flagler County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,260,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Palm Coast is seeking bids from qualified contractors for improvements being made to Citation Pkwy. & Seminole Woods Pkwy. Contractor shall be responsible for all labor, materials, equipment, transportation, coordination and incidentals necessary for the improvements being made to Citation Pkwy. & Seminole Woods Pkwy. The project area is approximately 0.3 miles long. The objective is to eliminate the stop sign at the existing intersection and convert Citation Pkwy into the extension of Sesame Boulevard to the intersection with Seminole Woods Blvd. Construction shall include, but not limited to: Extension of Sesame Boulevard to Seminole Woods Blvd by elimination of intersection at Citation Pkwy and Sesame Boulevard; Replacement of deficient culvert/bridge on Sesame Boulevard; Access road to City Property at Dry Lake; Intersection Improvements at Citation Parkway and Seminole Woods Boulevard including the addition of a left turn lane and a right turn lane; Intersection improvements at Citation Parkway and Universal Trail including the addition of a left turn lane; Drainage and utility design work; Multi-use path/passive linear park along the south side of Sesame Boulevard.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents