Similar Projects
Filtration Building Miscellaneous Improvements
Renovation
Results
$18,900,000 to $23,100,000 est. value
Las Vegas, NV 89142

Membrane Basin Recoating
Renovation
Post-Bid
$3,500,000 to $4,000,000 est. value
Las Vegas, North Las Vegas, NV 89031

Reported 05/25/2021 09:51 AM
Project Title

Rapid Response Construction Services

Physical Address View project details and contacts
City, State (County) Las Vegas, NV   (Clark County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $14,400,000 to $14,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes: Critical repair services to Owner infrastructure in the Right-of-Way or at any of the Owner’s facilities including, but not limited to, the Flamingo Water Resource Center, Blue Diamond Ponds, Moapa Valley Treatment Facility, Laughlin Water Resource Center, Desert Breeze Water Resource Center, Indian Springs Treatment Facility, Searchlight Treatment Ponds. The Work may consist of all or part of the following: notifying One Call; contacting utilities; obtaining permits; bypass pumping; planning, setting and removal of barricades; removal and replacement of asphalt; excavation; compacting backfill; surface restoration; repair of wastewater collection and/or 0treatment facilities; repair of potable and non-potable water lines; or any other work related to any Owner facilities or property. Work will start at times and locations directed by the Owner. Contractor has a one (1) hour response time unless otherwise directed by the District. Work may be required any time of the day and any day of the year. Work shall start within two (2) hours of receiving direction from the Owner and continue until complete unless otherwise directed by the Owner.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents