Similar Projects
Baker Road Crosswalk at Forest - City of Dexter
Infrastructure
Conception
$350,000 est. value
Dexter, MI 48130

Dexter-Chelsea Road Trail Connector - City of Dexter
Infrastructure
Conception
$1,500,000 est. value
Dexter, MI

Depot Street Mixed-Use Development
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Ann Arbor, MI 48104

Depot Street Mixed-Use Development
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Ann Arbor, MI 48104

Parkland Plaza Senior Living Facility - Rebid
New Construction, Infrastructure - 163,690 SF
Post-Bid
$50,000,000 CJ est. value
Ann Arbor, MI 48103

The Grove at Veridian
New Construction, Infrastructure - 10,076 SF
Post-Bid
$10,000,000 CJ est. value
Ann Arbor, MI 48104

2022 Bandemer Park Bridge Repairs and Renovations
Infrastructure
Results
$505,567 CJ est. value
Ann Arbor, MI 48104

2022 Bandemer Park Bridge Repairs and Renovations
Infrastructure
Results
$505,567 CJ est. value
Ann Arbor, MI 48104

Mill Creek Townhomes
New Construction, Infrastructure, Renovation - 7,010 SF
Construction
$21,000,000 CJ est. value
Ann Arbor, MI 48108

Mill Creek Townhomes
New Construction, Infrastructure, Renovation - 7,010 SF
Construction
$21,000,000 CJ est. value
Ann Arbor, MI 48108

Sutherland Square
New Construction, Infrastructure - 4,500 SF
Pending Verification
$50,000,000 CJ est. value
Ann Arbor, MI 48108

Sutherland Square
New Construction, Infrastructure - 4,500 SF
Pending Verification
$50,000,000 CJ est. value
Ann Arbor, MI 48108

Dan Hoey Road Sidewalk - City of Dexter
Infrastructure
Conception
Dexter, MI 48130

A2 North Maple Road Development / Ann Arbor
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Ann Arbor, MI 48103

New Fire Station 4 - City of Ann Arbor
Demolition, New Construction, Infrastructure - 12,097 SF
Post-Bid
$6,000,000 CJ est. value
Ann Arbor, MI 48104

Last Updated 12/18/2023 11:32 AM
Project Title

Wolverine Pickleball

Physical Address View project details and contacts
City, State (County) Ann Arbor, MI 48103   (Washtenaw County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Fitness Center, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction complete as of July 2023 , Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 18, 2023, construction is complete.

Details

1 Story Above Grade, 38,526 SF. Acre, 5 Acre.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents