Similar Projects
Venture Academy High School Improvements
Renovation
Conception
Minneapolis, MN 55414

Venture Academy Middle School
Build-Out
Conception
Minneapolis, MN

Park Center Senior High Locker Room Renovations
Build-out, Renovation
Bidding
$200,000 CJ est. value
Minneapolis, MN 55443

St Louis Park High School Classroom Renovations
Build-out, Renovation
Bidding
$4,000,000 CJ est. value
St Louis Park, MN 55426

Best Value Contractor for the North High School Renovations
Renovation
Post-Bid
Minneapolis, MN 55411

Armstrong High School 2022 LTFM
Renovation
Post-Bid
Minneapolis, MN 55441

Momentum Addition to Pagel Activity Center
Addition - 10,000 SF
Results
Minnetonka, MN 55345

Lucy Laney Elementary - C125 SPED Toilet
New Construction
Results
MN 55412

Baker OLC Shower/Infirmary Building
Construction
$900,000 to $950,000 est. value
Maple Plain, MN 55359

Justice Page Middle School Addition and Renovation
Renovation, Addition
Construction
Minneapolis, MN 55419

New Century School
Renovation, Infrastructure - 55,100 SF
Pending Verification
$4,000,000 CJ est. value
Bloomington, MN 55420

FY23 Flooring Replacement Bid Package 2 New Flooring
Renovation
Bidding
$70,000 CJ est. value
Minneapolis, MN 55415

2022 Andersen Middle School Phase 2
Renovation
Post-Bid
Minneapolis, MN 55407

Bethune Arts Magnet Renovations and Performance Addition Project
Renovation, Addition
Results
Minneapolis, MN 55411

Minnetonka High School - New Vantage / Momentum Building
New Construction, Infrastructure - 36,300 SF
Construction
$15,555,083 CJ est. value
Minnetonka, MN 55345

Last Updated 03/15/2023 05:06 PM
Project Title

Demolition of existing cold storage equipment, space and installation of new cold storage equipment

Physical Address View project details and contacts
City, State (County) Maple Grove, MN 55311   (Hennepin County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Purchase of Cold Storage Equipment, Demolition of Existing Equipment, and Installation of Newly Purchased Equipment. This is a Turnkey Project. Recommendation for Award Will Be Submitted to the School Board for Their Consideration at a Later Public Meeting. Vendor Questions Received by March 3, 2023. -- District Response to Question Sent to Vendors by March 6, 2023. School Board Awards Bid March 21, 2023. The Board Reserves the Right to Reject Any or All Bids and to Waive Any Informality in Bids. Osseo Area Schools is seeking sealed bids for projects at two different schools. The projects are turnkey replacements of commercial kitchen walk-in cooler and walk-in cooler/freezer combo equipment at the schools listed below. Maple Grove Middle School Park Center Senior High School 7000 Hemlock Ln. N. 7300 Brooklyn Blvd. Maple Grove, MN 55369 Brooklyn Park, MN 55443 Equipment Requested o Walk-in cooler/freezer combo to Maple Grove Middle School o Walk-in cooler to Park Center Senior High School Maple Grove Middle School (MGMS) Demolition o May begin June 12, 2023. o Must be completed by June 28, 2023. Demolition of the existing walk-in cooler/freezer combo as well as building and utility alterations as required for new install. Install poly barrier to keep the dust and debris out of other areas of the building and equipment. Removal and disposal of all debris and demolished equipment. Provide a dumpster at the job site and remove the dumpster when demolition is complete. Demo may include but not limited to: o refrigeration line o insulation o condensate lines o condensing units o evaporators o Electrical o Plumbing o Block wall work o Fill in old office door o Recessed floor demo and pouring new sub floor o Removal of the hand sink o Removal of the fire alarm o Removal of existing lights and ceiling tiles o Removal of existing electrical outlets and switches, phone jacks o Removal of speaker system in office o Building fire suppression system o X-ray existing floor for hidden utilities Installation o Must begin after June 30, 2023. o Must be completed by August 11, 2023. Installation of the new cooler/freezer combo walk-in may include but not be limited to: o Receipt of new equipment from equipment vendor at school building o Plumbing o Electrical o Building fire suppression system o Provide and install ceiling tiles and flooring to match existing floor and ceiling where needed. Park Center Senior High (PCSH) Demolition o May begin June 12, 2023. o Must be completed by June 28, 2023. Demolition of the existing walk-in cooler as well as building and utility alterations as required for new install. Install poly barrier to keep the dust and debris out of other areas of the building and equipment. Removal and disposal of all debris and demolished equipment. Provide a dumpster at the job site and remove the dumpster when demolition is complete. Demo may include but not limited to: o refrigeration lines, o insulation, o condensate lines, o condensing units, o evaporators, o Electrical o Plumbing o Recessed floor demo and pouring new sub floor o Removal of the fire alarm o Removal of existing lights and ceiling tiles o Building fire suppression system o X-ray existing cooler floor for hidden utilities o Provide stainless steel cover to cover old timeclock and thermometer cover o Recessed floor demo and pouring new subfloor o Block wall work

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents