Similar Projects
Last Updated | 12/02/2022 05:10 AM |
Project Title | Building Automation System Upgrades -Bid Package 2 - for the Newark Public Schools Regions North, South, West, East/Central |
Physical Address | View project details and contacts |
City, State (County) | Newark, NJ 07102 (Essex County) |
Category(s) | Education |
Sub-Category(s) | Elementary School, Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $370,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of November 23, 2022, bids were rejected. No definite date for the rebid.** Building Automation System Upgrades - Bid Package #2 - for the Newark Public Schools Regions North, South, West & East/Central All work is expected to be complete by December 31, 2024. The contractor shall provide all control instruments, sensors, relays, control valves, damper actuators, panel enclosures, and other accessory equipment required to satisfy the intent of the scope of work and provide a complete and operable Building Management System for the locations specified in the table above. As indicated on drawing M-001 in Appendix 1 and for the East/Central Region only, installation of the controls components, wire and conduit will be by Others. Locations- American History High School 74 Montgomery Street 1910 117,509 Ann Street School 30 Ann Street 1891, 1897, 1916, 2002 94,609 Cleveland Elementary School 388 Bergen Street 1912 77,449 Early Childhood Center - Central 70 Montgomery Street 1974 38,882 East Side High School 238 Van Buren Street 1911 302,353 East Ward Elementary School ("Old Oliver Street") 104 Oliver Street 1869, 1904, 1915, 1921 93,200 Hawkins Street School 8 Hawkins Street 1887, 1904, 1922, 1950 69,161 Lafayette Street School 205 Lafayette Street 1908 68,118 Newark Vocational High School 301 West Kinney Street 1957 155,959 Quitman Street School 21 Quitman Street 1963 122,269 Sir Isaac Newton Elementary School (aka Uplift Newark Evening School) 150 Newton Street 1873, 1900, 1904 90,906 Sussex Avenue School 307 Sussex Avenue 1900, 1955, 1996 64,762 Wilson Avenue School 19 Wilson Avenue 1881, 1900, 1907, 1924 85,913 Wilson ECC (Alyea Street) 13 Patterson Street 1900 6,678 Central High School - BACnet Integration 246 18 th Avenue 2008 261,361 Oliver Street School - BACnet Integration 86 Oliver Street 2016 135,000 Science Park High School - BACnet Integration 260 Norfolk Street 2006 275,743 South Street School - BACnet Integration 44 Hermon Street 2018 103,000 Retrofit existing HVAC mechanical control system with new BACnet controls. Demo existing digital control panels and end devices and replace with new DDC controls including new panel, conduit and wire. Provide all 120/24 volt transformers and 24 volt power wiring to all devices that receive 24 volts. Mounting of new control panels and 120 VAC power by installing contractor. Damper actuators installed and wired by installing contractor. Include fire/acoustical caulking of own work. Include Network "Cat 6" data drops to new network panel. Includes one (1) Year Warranty on all parts and labor Includes electrical wiring Standards as described in specification Sections 230923 and 260001. All work during school in-session hours shall be scheduled second shift, typically 3:30pm- 11:00pm. All work completed over summer break or during non-school days are based on a normal workday schedule (typically 7:00 am to 3:30 pm). Electrical installation for controls is based on local electrical regulations in effect at the time of contract signing. LAN connection points to supervisory controllers in each building will be provided by the owner. Contractor will make the physical connection between the supervisor controller and the Ethernet switch. Existing safety devices will be reused (smoke detectors, low temperature lockouts, etc.) are assumed to be functioning properly and will be reused unless otherwise specified. Existing thermowells shall be reused in boiler rooms, new thermowells as required shall be installed under this contract. Locations which preclude the installation of temperature sensor thermowells due to restricted access or safety reasons, strap on pipe sensors shall be acceptable, provided they are properly installed and insulated from ambient temperatures. New electric valves and dampers actuators shall be provided where indicated. Existing mechanical and electrical equipment that will have new control systems applied is expected to be in good working order. If any piece of equipment including, but not limited to AHUs, Chillers, Boilers, Pumps are not functioning properly during the time of installation, JCI and the Owner will be notified immediately On behalf of the Newark Public Schools, Johnson Controls, Inc. is requesting bid proposals for the items or projects listed below. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27. Bidders must hold the following NJ Division of Property Management and Construction classifications: C032 (HVACR) or C047 (Electrical) or C043 (Control Systems) or C098 (Energy Management Systems) Bidders are required to comply with the requirements of P.L. 1999, c. 238, (N.J.S.A. 34:11-56 et seq.) where applicable. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |