Similar Projects
Replace Natural Gas Piping (House Piping)
Post-Bid
Weldon, NC 27890

Demolition Services for Harnett County Public Building/Facilities Management
Demolition
Post-Bid
Olivia, NC 27332

Gas Leak Detection and Atmospheric Corrosion Survey Services
Term Contract
Results
Greenville, NC 27834

Boat Refueling System Repairs for the U.S. Coast Guard (USCG) Station Hatteras Inlet
Results
Hatteras, NC 27943

Former Police HQ Building - Underground Storage Tank Closure
Post-Bid
Raleigh, NC 27601

SHP High Point UST Removal
Results
Less than $20,000 est. value
High Point, NC 27263

Petroleum Tank Installation, Operations and Maintenance Services
Term Contract
Post-Bid
Charlotte, NC 28206

Natural Gas System Expansion
Results
Lexington, NC

Fuel Storage Tanks
Term Contract
Post-Bid
Raleigh, NC 27699

LCGC Generator Day Tank Replacement
Results
Sanford, NC 27330

Liquefied Petroleum Gas & Tank Monitoring Services
Post-Bid
Jacksonville, NC 28542

Natural Gas Distribution Construction Services
Results
Greenville, NC 27834

Maintenance Fuel Facility Secondary Containment Bid Package
Post-Bid
Raleigh, NC

Underground Utility Locating
Term Contract
Results
Raleigh, NC 27610

Fuel Removal and AST STI SP0001 External Inspection at Military Ocean Terminal Sunny Point
Post-Bid
Southport, NC

Reported 07/31/2021 12:00 AM
Project Title

6,000 Gallon Diesel Tank

Physical Address View project details and contacts
City, State (County) New London, NC   (Stanly County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The 145th Airlift Wing intends to issue a solicitation and award a firm-fixed price contract to install a 6,000 gallon, UL Listed 2085, double wall, cylindrical, fire protected, above ground diesel fuel tank with fuel dispenser. Tank installation will also include 36” wide galvanized steel staircase, catwalk with fiberglass platform, and handrails along entire length of tank. There are various other requirements, which will be posted with solicitation.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents