Similar Projects
Fire Alarm Replacement - AUD / DPWP
Alteration
Bidding
$185,000 est. value
Worcester, MA 01608

District 3 - Scheduled and Emergency Standpipe and Fire Safety Systems Inspection, Testing and Repairs at Various Locations
Alteration
Bidding
$159,000 est. value

Worcester State University - Fire Pump Replacement, Dowden Hall
Post-Bid
$135,000 est. value
Worcester, MA 01602

Longsjo School Fire Protection
Post-Bid
Less than $165,000 est. value
Fitchburg, MA 01420

Hastings Elementary School Automatic Sprinkler and Fire Alarm Upgrades - General Bid
Results
$995,000 est. value
Westborough, MA 01581

Hastings Elementary School Automatic Sprinkler and Fire Alarm Upgrades - Filed Sub Bids
Results
$995,000 est. value
Westborough, MA 01581

Fire Alarm Upgrades at the Tucker Apartment Building
Alteration
Bidding
$63,124 est. value
Baldwinville, MA

Fire Alarm System Testing, Maintenance and Repair Services
Term Contract
Post-Bid
Fitchburg, MA

New Sprinkler Service to the Bryn Mawr Elementary School
Results
$350,000 est. value
Auburn, MA 01501

Inspection, Testing, Maintenance of Fire Preventive Systems
Post-Bid

Maintenance and Repairs to The Existing Fire Alarm System
Term Contract
Results
$55,720 est. value
Westborough, MA 01581

Sprinkler Upgrade
Alteration
Post-Bid
Rutland, MA 01543

Fire Alarm Testing and Repairs Service Contract
Results
Less than $49,999 est. value
Clinton, MA 01510

Fire Detection and Fire Suppression Systems Annual Inspection and Repair
Term Contract
Post-Bid
$20,000 est. value
Shrewsbury, MA

Fire Alarm System at John Augustus Hall
Results
$315,000 est. value
West Boylston, MA 01583

Reported 11/20/2021 12:00 AM
Project Title

Fire Protection Work - Parking Garage

Physical Address View project details and contacts
City, State (County) Leominster, MA 01453   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Rust Removal - Remove rust from existing beams and columns by mechanical means, SSPC-SP 3, "Power Tool Cleaning" down to bare metal. Prep surfaces for fireproofing application, including priming. Spray Fireproofing - Provide steel column and beam spray-on fireproofing to achieve 1-HR fire rating. Apply to all exposed steel structure components. Column Protection - Provide high density polyethylene column protectors, 42" high, sized to wrap columns and fireproofing. Protectors shall consist of two-piece assemblies connected by straps. Measure column/fireproofing widths prior to ordering. Install in accordance with manufacturer's printed instructions. At locations where utility lines travel vertically, install so that utility line fits in the gap between components.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents