Similar Projects
Ilchester Property Retaining Wall at Patapsco Valley State Park
Infrastructure
Bidding
$100,000 to $500,000 est. value
Ellicott City, MD 21043

Construction Services City Dock Stormwater and Flood Mitigation Improvements
New Construction, Infrastructure
Bidding
Annapolis, MD

North Alley Drainage Improvements - Phase 2
Post-Bid
New Market, MD 21774

Longfield Drainage Improvements
Post-Bid
$2,500,001 to $5,000,000 est. value
Forestville, MD 20747

Bulkhead Cap Maintenance Phase 2
- 62,500 SF
Results
$100,000 to $500,000 est. value
Ocean City, MD 21842

Washingtonian Woods Slope Failure Remediation
Results
Gaithersburg, MD 20878

Beverly Triton Nature Park
New Construction
Construction
$3,000,000 est. value
Edgewater, MD 21037

Mousetown Road Culvert Replacements
Infrastructure
Bidding
$500,001 to $1,000,000 est. value
Hagerstown, MD

Design Build Cree Drive Drainage Improvements and Road Repair
Post-Bid
Forest Heights, MD 20745

Heavenly Pond Stream Restoration
Results
Bel Air, MD 21014

Replacement of Small Structure No. 11010X0 on US 219 in Garrett County
Infrastructure
Bidding
$800,000 est. value
McHenry, MD

Pipe, Corrugated Aluminum, Term Agreement
Term Contract
Post-Bid
Towson, MD

Construction Services for Lewis Lane, Street and Drainage Improvements
Results
Havre de Grace, MD 21078

Hurst Creek Resiliency and Dredging Project
Infrastructure
Post-Bid
MD

Fort Smallwood Park Shoreline Project
Results
$1,500,000 to $2,000,000 est. value
Pasadena, MD 21122

Last Updated 04/19/2022 07:50 AM
Project Title

Highland Avenue Drainage Improvements

Physical Address View project details and contacts
City, State (County) Hagerstown, MD 21740   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work Includes Clearing and grubbing and sediment control, removal - portion of existing asphalt walking path and disposal of material Grading, excavation and disposal of excess soil at approved site, furnish and install single WR Inlet with frame and bicycle/pedestrain safe grate. Furnish and install 12" HP storm pipe,rock rip-rap apron,soil stabilization matting, asphalt walking path, Place 4" topsoil and establish turf All other related items necessary to complete the work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents