Similar Projects
Reported | 11/05/2020 12:00 AM |
Project Title | Two Corridor Projects - Preliminary Engineer Services |
Physical Address | View project details and contacts |
City, State (County) | Merrionette Park, IL 60655 (Cook County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Kedzie Avenue: Vollmer Road to 159th Street and Sauk Village Multi-Use Path - Scope of services includes the preparation of preliminary engineering and environmental (Phase I) studies for roadway improvements in accordance with policies from the County and the Illinois Department of Transportation (IDOT). These policies include and are not limited to Connecting Cook County: 2040 Long Range Transportation Plan, the IDOT Bureau of Local Roads and Streets Manual, the IDOT Bureau of Design and Environment Manual, the IDOT Bridge Manual, the IDOT Geotechnical Manual, the IDOT Drainage Manual, AASHTO LRFD Bridge Design Specifications, Cook County’s design guide for Complete Streets Policy – Cook County, IL, 2011, and other policies adopted by the County or IDOT. The Consultant must also perform these services in a manner which fulfills all criteria related to federal funding standards, codes, and procedures. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |