Similar Projects
UST Inspect Maintain and Repair
Alteration
Design
$1,000,000 est. value
WA

Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

I-90/I-5, E Sunset Way Vic and Nb Lowell Rd Vic Pccp Exp Jnt Rehab and Deck Overlay
Infrastructure
Bidding
Less than $1,250,000 est. value

I-90/I-5, E Sunset Way Vic and Nb Lowell Rd Vic Pccp Exp Jnt Rehab and Deck Overlay
Infrastructure
Bidding
Less than $1,250,000 est. value

Friday Harbor Labs Sewer Repair
Renovation, Alteration
Post-Bid
$160,000 to $200,000 est. value
Friday Harbor, WA 98250

Hatch Road Bridge Deck Replacement
Infrastructure
Post-Bid
$1,800,000 to $2,200,000 est. value
Spokane, WA

Harbour Reach Drive Improvements
Infrastructure
Results
$915,224 est. value
Mukilteo, WA 98275

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

Bremerton Station
Renovation, Infrastructure
Pending Verification
Bremerton, WA 98310

Stormwater Repairs Phase III Construction
Alteration
Design
$5,200,000 est. value
WA

I-5, Mounts Rd To Steilacoom-Dupont Rd - Corridor Improvements
Infrastructure
Bidding
$165,000,000 to $195,000,000 est. value
WA

Sylvester Street Safety Improvements
Infrastructure
Post-Bid
Pasco, WA 99301

124th Avenue NE- NE 12th Street to NE Spring Boulevard
Infrastructure
Results
$8,221,853 est. value
Bellevue, WA 98007

SR 20 Skagit River Fish Passage
Infrastructure
Bidding
$4,000,000 to $4,500,000 est. value
WA

Stromwater Operations and Maintenance
Alteration
Post-Bid
Port Orchard, WA 98366

Last Updated 02/22/2022 11:53 AM
Project Title

North Industrial Way Storm Water Retrofit and Overlay

Physical Address View project details and contacts
City, State (County) Pasco, WA 99301   (Franklin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $570,575
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project involves the partial grind and overlay of Industrial Way, replacement of identified catch basins between Foster Wells Road and E. Kartchner Street, and other work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents