Similar Projects
Roofing Maintenance and Minor Roofing Repairs
Term Contract
Bidding
SC

Roofing Supplies
Term Contract
Sub-Bidding
Columbia, SC 29201

Armstrong Elementary School - Roof Replacement
Renovation - 86,650 SF
Sub-Bidding
$177,000 CJ est. value
Greenville, SC 29617

UofSC Aiken Pacer Commons Roof Replacement
Alteration
Post-Bid
$1,500,000 to $1,800,000 est. value
Aiken, SC

Selective Roof Replacement and Selective Repairs
Alteration
Post-Bid
West Columbia, SC 29170

Pickens and Anderson Hall Roof Replacement
Results
$900,000 to $990,000 est. value
Pendleton, SC 29670

Monarch Elementary School Selective Roof Repairs
Results
Union, SC

Buildings B and E Roof Replacement - Brighton Place
Renovation
Construction
$56,875 CJ est. value
Charleston, SC 29407

Roof Replacement/Repairs of The Goose Creek Municipal Complex
Renovation
Sub-Bidding
$300,000 CJ est. value
Goose Creek, SC 29445

Anderson Hall Canopy Roof Recovery
Alteration
Post-Bid
$25,000 to $50,000 est. value
Pendleton, SC 29670

Anderson VR Center Reroofing
Alteration
Results
$550,000 to $650,000 est. value
Anderson, SC

Library Awning
Renovation
Sub-Bidding
$20,000 CJ est. value
Orangeburg, SC 29115

Bldg 198 Water Intrusion
Term Contract
Post-Bid
$100,000 to $250,000 est. value
North Charleston, SC 29405

Greenwood VOR Membrane Roof
Term Contract
Results
$100,000 to $250,000 est. value
Greenwood, SC

Replace the Existing Roof Coverings
Alteration
Post-Bid
North Charleston, SC 29418

Last Updated 05/11/2023 06:27 PM
Project Title

Barnwell School District #45 2023 Roofing Projects

Physical Address View project details and contacts
City, State (County) Barnwell, SC 29812   (Barnwell County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $940,400 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A. The Work of Project is defined by the Contract Documents and consists of the following (Numbered sequence is not necessarily indicative of workflow) 1. General a. Contractor is to verify that all roof drains, roof gutters, and downspouts are free of debris and free flowing prior to the start of work and at the end of the project. Owner and Consultant are to be notified of any drainage-related issues. 2. Barnwell Primary School Roof Replacement and Repair: a. Execute miscellaneous life extending repairs throughout campus. b. Fully adhere fleeceback PVC over 2007 era roofs (see drawing). Provide 20 year labor and material warranty. 3. Barnwell Primary School Gym Roof Replacement: a. Remove existing asphalt shingles. b. Remove existing wood decking. Fasten 3/4 plywood to existing rafters. c. Install synthetic underlayment over wood deck. d. Install new eave metal. e. Install premium asphalt shingles. f. Install new side wall flashings. g. Install new gutters and downspouts. g. Waterproof side walls. i. Spot repoint exterior brick. Replace shingle roof at the Barnwell Primary Gym, Recover modified bitumen roofs at Barnwell Primary and Guinyard Butler Middle School. Perform miscellaneous repairs at the Primary, Elementary, and Middle School. Construction Cost Range: 500-700K *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents