Reported 01/29/2022 12:00 AM
Project Title

Cach-Admin Office Asbestos Tile Removal

Physical Address View project details and contacts
City, State (County) State-Wide: AZ
Category(s) Environmental, Single Trades
Sub-Category(s) Flooring, Hazardous Waste Disposal
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor will be responsible for removal of existing Carpet floor, asbestos tile floor, vinyl, and wood cove base. There is one layer of Carpet covering the Asbestos tile floor. The top layer was installed in 1980 over the existing asbestos tile and mastic. Both layers are damaged and required removal for new carpet tiles. The original tile and mastic (Flintkote Classic XI) is damaged and presents an indoor air quality hazard. No reinstallation of tile is required.

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents