Similar Projects
Last Updated | 10/06/2022 06:31 PM |
Project Title | Water Line Replacement |
Physical Address | View project details and contacts |
City, State (County) | Two Rivers, WI 54241 (Manitowoc County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected April 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $290,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project has been cancelled This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. The project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, so the DFD will bid one bid package for all work to general prime contractors In general the work consists of construction of approximately 3800 linear feet of 2-inch water line in a seasonal campground, water foundations, drain manholes, and associated work Base Bid will be received for: A single lump sum bid for All Work Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |