Similar Projects
Maple Grove - North County Line Const OPS / PVRPLA
Infrastructure
Conception
$5,000,000 CJ est. value
Reedsville, WI 54230

Brillion - Reedsville Const Ops / BRRPL
Infrastructure
Design
$750,000 CJ est. value
Branch, WI 54247

Central Park West Redevelopment
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Two Rivers, WI 54241

Central Park West Redevelopment
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Two Rivers, WI 54241

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Mishicot High School - Track and Field Redevelopment
Renovation
Post-Bid
Mishicot, WI 54228

2021 South Fifth Avenue Utility and Street Improvements, a Local Road Improvement Project
Results
Less than $300,000 est. value
Saint Nazianz, WI 54232

2021-2024 Underground Water Utility Maintenance
Term Contract
Results
Manitowoc, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Repair SSG Andrew Miller ARC Manitowoc, WI
Addition, Demolition, Infrastructure, Renovation - 17,578 SF
Pending Verification
$9,379,249 CJ est. value
Manitowoc, WI 54220

Forest Avenue Apartments
New Construction, Infrastructure - 61,206 SF
Pending Verification
$17,000,000 CJ est. value
Two Rivers, WI 54241

Hot Mix Pave for Cemetery Road
Infrastructure
Post-Bid
$90,000 CJ est. value
Mishicot, WI 54228

Underwater Repair of West Counterweight of SS Badger Carferry Ramp
Infrastructure
Results
Manitowoc, WI

Resurface Rawley Point Bike Trail
Infrastructure
Construction
$198,723 CJ est. value
Two Rivers, WI 54241

Last Updated 10/06/2022 06:31 PM
Project Title

Water Line Replacement

Physical Address View project details and contacts
City, State (County) Two Rivers, WI 54241   (Manitowoc County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $290,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project has been cancelled This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. The project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, so the DFD will bid one bid package for all work to general prime contractors In general the work consists of construction of approximately 3800 linear feet of 2-inch water line in a seasonal campground, water foundations, drain manholes, and associated work Base Bid will be received for: A single lump sum bid for All Work Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents