Similar Projects
Highway 902 Pump Station Chemical Booster Station
Infrastructure
Bidding
$200,000 est. value
Pittsboro, NC 27312

Natural Gas System Improvements
Infrastructure
Bidding
Shelby, NC

Maintenance Fuel Facility Secondary Containment Bid Package
Post-Bid
Raleigh, NC

Fuel Removal and AST STI SP0001 External Inspection at Military Ocean Terminal Sunny Point
Post-Bid
Southport, NC

Natural Gas System Improvements - Tapping Tee Replacement Project
Results
Less than $642,650 est. value
Wilson, NC

ODOR Control System for Sludge Holding Tanks, Ocean Sands Wastewater Treatment Plant 200,000 GPD, Phase I
Results
$60,000 est. value
Corolla, NC 27929

Natural Gas System Annual Labor Contract
Term Contract
Bidding
Rocky Mount, NC

Fuel Farm Improvements Project
Infrastructure
Post-Bid
Elizabeth City, NC

Replacement of Underground Fuel Oil Lines Southwest Elementary
Results
Jacksonville, NC 28540

Expansion of the Municipal Gas System
Infrastructure
Post-Bid
Wilson, NC

Fuel Management System
Results
Less than $349,960 est. value
Jacksonville, NC 28540

6,000 Gallon Diesel Tank
Term Contract
Post-Bid
New London, NC

Nano Plant Chemical Line Replacment-Fy21-02
Results
Jacksonville, NC

Z2GC--UST B42 & 21 Repair & Maintenance
Renovation, Infrastructure
Post-Bid
Salisbury, NC 28144

Leland Fuel Site Upgrades
Results
Leland, NC 28451

Last Updated 04/26/2022 08:54 AM
Project Title

B159 & B147 Repair Fire Booster Fuel Tanks Fill

Physical Address View project details and contacts
City, State (County) Cherry Point, NC 28533   (Craven County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements": a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents