Similar Projects
Wastewater System Closure NECX-CCX
Renovation
Bidding
Roan Mountain, TN 37687

Signal Mountain WWTP Catwalk Replacement
Post-Bid
Chattanooga, TN

Reclaim Water Meters
New Construction
Post-Bid
Murfreesboro, TN 37130

High Performance Lining at the Wastewater Treatment Plant
Results
Spring Hill, TN 37174

Wastewater Treatment Plant Improvements
Infrastructure
Results
$13,000,000 to $15,000,000 est. value
White House, TN 37188

Sewage Treatment Plant Modernization
New Construction, Renovation
Post-Bid
$10,000,000 est. value
Oak Ridge, TN 37831

Water Resource Recovery Facility
Results
$8,400,000 est. value
Monterey, TN 38574

Biological System at their New Wastewater Treatment Plant
Post-Bid
Ashland City, TN

Wastewater Treatment Plant Aeration Equipment Replacement
Renovation
Results
Woodbury, TN

Ebenezer Sewer Basin Improvements Project
Renovation
Post-Bid
TN

Moccasin Bend Wastewater Treatment Plant Improvements
Results
Chattanooga, TN 37405

McCroskey Island Wastewater Treatment Plant Improvements
New Construction
Post-Bid
$1,500,000 est. value
Sevierville, TN 37876

Wastewater Treatment Plant Upgrades
Renovation
Results
$2,250,000 est. value
Morrison, TN

Operation of Five Package Sewer Plants
New Construction
Post-Bid
Elizabethton, TN

Miller Avenue - WWTP Clarifier Replacement
Alteration
Results
Jackson, TN 38305

Last Updated 12/10/2021 04:27 PM
Project Title

Wastewater Treatment Plants Improvements

Physical Address View project details and contacts
City, State (County) Gatlinburg, TN 37738   (Sevier County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results, Construction Completion Expected October 2024
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provision and Installation of new influent screens, a new IFAS treatment system including instrumentation and controls, new effluent disc filters, new UV disinfection system, new rotary drum thickeners, new centrifuges, and various related and appurtenant items at the Gatlinburg Wastewater Treatment Plant, including all excavation, grading and finish work for a complete project as shown or specified in the Contract Documents

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents