Similar Projects
Windermere South 4th Addition
New Construction
Design
Shakopee, MN 55379

Rehabilitation Retaining Walls
Alteration
Design
$3,500,000 est. value
Shakopee, MN

2021 Sealcoats
Post-Bid
MN

North Smoky Hills Graveling
Renovation
Post-Bid

Road Construction of Edenvale Court
Results
$273,537 est. value
MN 55020

Highway 282 and Creek Lane
Results
$2,700,000 est. value
Jordan, MN 55352

Erik's Transmission
New Construction - 1,056 SF
Construction
MN

Springview Meadow Residential Development
New Construction, Infrastructure
Construction
Prior Lake, MN

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

2021 Infrastructure Improvements
Results
Jordan, MN

Street Maintenance JPA
Results
Apple Valley, Bloomington, Burnsville, Eagan, Elko, Farmington, Hastings, Lakeville, Mendota Heights, Prior Lake, Rosemount, Savage, Shakopee, South Saint Paul, West Saint Paul, MN

2021 Trail Sealcoat
Results
Belle Plaine, Eagan, Elko, Jordan, New Market, Prior Lake, Savage, Waconia, MN

West Cedar Lake Drive Roadway Improvements
Results
$575,000 est. value
MN 56071

2021 Street and Utility Reconstruction
Results
Shakopee, MN

2021 Bituminous Pavement Rehabilitation
Results
$2,900,000 est. value
Shakopee, MN

Last Updated 07/21/2022 03:17 PM
Project Title

70th Street Speculative Warehouse

Physical Address View project details and contacts
City, State (County) Shakopee, MN 55379   (Scott County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $53,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 21, 2022 the project is in planning stage. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined.

Details

506,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents