Similar Projects
Queen's Medical Center Expansion
New Construction, Renovation, Addition
Pending Verification
$1,000,000,000 est. value
Honolulu, HI 96811

Last Updated 07/28/2022 03:34 PM
Project Title

United States Postal Service (USPS) Waialae Kahala Parking Deck

Physical Address View project details and contacts
City, State (County) Honolulu, HI 96816   (Honolulu County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Parking Garage, Post Office
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

The primary goals of the rehabilitation are to restore the integrity of the concrete structure and replace the primary waterproofing system and concrete wear slab to help prevent water leaks above the post office and mailroom. The Contractor must provide all material, labor, tools, supplies, equipment, transportation, superintendence, temporary construction of every nature, and all other services and facilities necessary to complete the repair of the subject postal facility, in accordance with the Plans and Specifications, including all incidental work described in the contract documents. All costs should be included in the provided Schedule of Values. This will be a lump sum bid, based on quantities in the Schedule of Values (SOV). All incidental work items not specifically listed in the Schedule of Values should be included in the most appropriate Line Item. The cost associated with Quantity overruns will be based on the Unit Price included in the SOV. All work shall be in accordance with applicable codes and local regulations that may apply. In case of conflict in or between the Contract Documents and a governing code or ordinance, the more stringent standard shall apply Provide a job specific Health and Safety Plan, with Activity Hazard Analysis, and other general requirements presented in the Division 01 Specifications. In the event that any work will disturb ACM or LBP, immediately notify the Wood Project Manager. Follow USPS/OSHA guidelines if ACM/LBP materials will be disturbed. An allowance has been included in the SOV for ACM and/or LBP abatement. Identify proper lay down areas and coordinate all work with USPS personnel. Contractor is not to move mail processing equipment or containers without express written consent of the facility management. Repair or replace any USPS property that is damaged as a result of this work. Follow all USPS lock-out tag-out procedures. Cost for lock-out tag-out included in the Allowance for replacement of embedded electrical conduit. Adhere to all documentation required in the specification which includes, but not limited to, safety documentation, daily and weekly reports, submittals for products and packing slips, request for information forms, etc. Attend bi-weekly (every other week) project progress teleconferences/meetings during the project. Provide required closeout project and technical documents as required by the specifications. Unit and Lump Sum prices should be populated in the provided SOV. Unbalancing of Unit Prices in SOV shall be grounds for being determined to be non-responsive. 100% of payment and performance bonds are required. Bonds to list both Wood and USPS. Provide with pricing proposal, a preliminary schedule and phasing plan for the duration of the project. Phasing with the facility will be critical for the success of this project. Contractor should be aware that closure of the entire deck at one time, except for short durations, will not be permitted. Separate Excel Schedule of Values for should be populated with prices and will be the basis for the bid price. Schedule of Values Table in Specification Section 012200 Unit Prices is for reference only. Quantities in specifications and drawings are for reference only 104267-21-B-0029 Questions Due: Friday, July 15, 2022

Details

Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Access Doors and Panels, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Postal Specialties, Central Mail Delivery Boxes, Mail Collection Boxes, Receiving Boxes, Mail Boxes, Parcel Lockers, Package Depositories, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Postal, Packaging, and Shipping Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Container Processing and Packaging, Container Packing Equipment, Shipping Packaging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents