Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 4057 over Brush Run
Infrastructure
Design
$3,175,000 CJ est. value
Blaine Township, PA 15312

SR 4022 over Bridge Buffalo Creek
Demolition, New Construction, Infrastructure
Design
$2,300,000 CJ est. value
Washington, PA 15301

Baseball and Softball Field Renovations to the McDowell Field
Infrastructure
Bidding
$1,790,000 CJ est. value
Canonsburg, PA 15317

New Storage Building and Improve Maintenance Facility - Phase 3
New Construction, Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Eighty Four, PA 15330

Majestic Drive Slope Regrading
Infrastructure
Post-Bid
Canonsburg, PA 15317

Route 519 Fire Substation Bulk Excavation Removal and Grading
Alteration
Post-Bid
Canonsburg, PA 15317

Ridge Road PRV Project
Infrastructure
Results
$106,000 est. value
Centerville, PA 15417

Fire Substation - Final Site Work
Infrastructure
Results
$200,000 est. value
Eighty Four, PA 15330

Abandoned Mine Reclamation (AMR) Monongahela South No. 1 - Phase 2
Infrastructure
Construction
$493,352 CJ est. value
Monongahela, PA 15063

PA 88 SB - Charleroi CMAQ
Infrastructure
Conception
$3,380,400 CJ est. value
Finleyville, PA 15332

PA 18 over Chartiers Creek-2
Demolition, New Construction, Infrastructure
Design
$2,909,000 CJ est. value
Washington, PA 15301

Land Slide Remediation/Construction Services
Infrastructure
Bidding
$386,000 CJ est. value
Charleroi, PA 15022

Township Public Works Facility - Early Site Package
Infrastructure
Post-Bid
Cecil, PA

Last Updated 11/09/2022 01:06 PM
Project Title

Pigeon Creek Pump Station Outfall and West Alley Repairs Project - REBID

Physical Address View project details and contacts
City, State (County) Monongahela, PA 15063   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $90,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 26, 2022, bids were canceled. No definite date for the rebid. Location of Work B.2.1 All work to be done under this Contract is located in the City of Monongahela, Washington County, PA. The Pigeon Creek Pump Station emergency outfall and West Alley CSO diversion structure are situated approximately 3/4 of a mile apart. B.2.2 The Pigeon Creek pump station is located on the river side of Main Street/PA Route 837 near the intersection with Gee Street. The pump station is situated on the south side of Pigeon Creek and the emergency outfall pipe is located on the other side of the stream. B.2.3 The West Alley CSO diversion structure is located on the river side of Main Street, near the railroad tracks. West Alley is situated between 6th Street and 7th Street. MACM H-244080/9-22 This project includes replacement of an emergency outfall pipe with endwall at the Pigeon Creek pump station site and installation of a check valve at the West Alley CSO diversion structure. Plans and specifications are on file at the office of the Authority, 521 West Main Street, Monongahela, PA 15063 and at the office of Hatch Associates Consultants, Inc., 1600 West Carson Street, Suite 1, Pittsburgh, PA 15219. A certified check payable to the Municipal Authority of the City of Monongahela or a bid bond on the bid form executed by the Bidder and a surety company approved by the Owner, in an amount equal to ten percent (10%) of the bid, shall be submitted with each bid, to guarantee the Bidders entrance into a contract if given the award. No bid bond shall be waived or returned because the Bidder has failed to or cannot comply with any requirements as set forth in the plans, specifications, or any applicable statutes of the Commonwealth of Pennsylvania or any applicable municipal ordinances. No bid may be withdrawn for sixty (60) calendar days after the scheduled closing time for receipt of bids. Work under the aforementioned Contract is subject to the requirements of the Pennsylvania Prevailing Wage Act (1961 August 15, PL 987; P.S. 165) and subsequent amendments. The Owner reserves the right to reject any or all bids and to waive any informalities in the bidding. Municipal Authority of the City of Monongahela

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents