Similar Projects
Roof Replacement at Glenhaven Condominiums
Alteration
Bidding
Langley, WA 98260

Building 2001 Roof and Gutter Project
Alteration
Bidding
Vancouver, WA 98660

Roofing Envelope Services
Post-Bid

Roofing Envelope Services
Post-Bid

Frenchman Hills Mold Remediation, Roofing Replacement, and Ventilation Improvements
Renovation, Alteration
Results
Royal City, WA 99357

Central Shop Re-Roof Project
Alteration
Results
$160,000 to $190,000 est. value
Bellingham, WA

Port of Bellingham Re-Roof International Trades Building
Alteration
Post-Bid
$360,000 est. value
Bellingham, WA

MHR Residential Roofing
Alteration
Results
Spanaway, Tacoma, WA

Wallenstien Performing Arts Roof Replacement
Alteration
Post-Bid
$375,000 to $480,000 est. value
Moses Lake, WA 98837

Roofing Services
Term Contract
Results
$272,484 est. value
Seattle, WA

Dirtworks Gazebo Roof Replacement project
Alteration
Post-Bid
Olympia, WA

Fleet Services Roof Replacement
Alteration
Results
Seattle, WA

Weatherization Residential Insulation 8536
Alteration
Post-Bid
WA

Weatherization Residential Insulation 8560
Alteration
Results
WA

Membrane Roof Replacement
Alteration
Post-Bid
WA

Last Updated 11/18/2021 01:06 AM
Project Title

Central Warehouse Facility Skylights Replacement

Physical Address View project details and contacts
City, State (County) Sequim, WA 98382   (Clallam County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To replacing skylights at the Central Warehouse Facility includes, but is not limited to, the following site work: Remove existing 107 quantity, 5 Ft. x 6 Ft. Velux Dynamic Double Dome Model 6072 skylights with frame. The District will provide dumpsters for disposal of old skylights with frame and haul away. Replace old skylights with 107 quantity new, 5 Ft. x 6 Ft. double dome prismatic style equal or similar to Model 6072 Velux Dynamic Double Dome skylights. Contractor must provide the District with skylight specifications and information sheet. The District can provide storage space and accept direct delivery of new skylights to the Central Warehouse Facility to reduce multiple transporting of skylights. Contractor shall schedule work and set-up and maintain a safe environment to work safely around and allow for pedestrian and vehicle traffic coming and going from the facility. At the end of the project, Contractor shall be responsible for site clean-up and removal of all equipment, debris, and miscellaneous material from the project site.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents