Similar Projects
2021 Sanitary Manhole Rehabilitation
Alteration
Bidding
IL

Large Diameter Sewer Main Rehabilitation
Infrastructure
Bidding
Chicago, IL

Catch Basin and Inlet Cleaning 2020-2021
Term Contract
Post-Bid
Mount Prospect, IL 60056

Sewer Root Control Treatment
Term Contract
Post-Bid
Saint Charles, IL 60174

Manhole Cleaning
Results
Palos Park, IL 60464

2020 Manhole Rehabilitation
Results
$337,726 to $359,476 est. value
Elk Grove Village, IL 60007

Large Diameter Sewer Rehabilitation: 21st and Cermak
Infrastructure
Bidding
Chicago, IL 60616

FY21 Sanitary and Storm Sewer Closed Circuit Television (CCTV)
Term Contract
Post-Bid
Niles, IL 60714

2020 Sanitary Sewer Inspection and Rehabilitation
Results
Oak Lawn, IL 60453

Large Diameter Sewer Rehabilitation: Various Locations
Infrastructure
Bidding
Chicago, IL

Village Wide Emergency Water and Sewer Repair Work
Term Contract
Post-Bid
Oak Park, IL

Circle Avenue Sewer Separation Improvements
Results
Less than $4,000,000 est. value
Forest Park, IL 60130

CPS Dusable Sewer Line and Sink Hole
Alteration
Bidding
Chicago, IL

Playfield Subdivision Phase 3 Sanitary Sewer Rehabilitation
Post-Bid
Crestwood, IL

2020 Manhole Rehabilitation
Results
Palos Heights, IL 60463

Last Updated 06/24/2021 08:58 AM
Project Title

2021 Lord Street Combined Sewer Separation - Phase VI

Physical Address View project details and contacts
City, State (County) Elgin, IL 60123 (Cook, Kane Counties)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed Work is generally described follows: The project includes, but is not limited to the following base bid quantities: The project includes, but is not limited to the following base bid quantities: 363 linear feet of water main (4-6"), six valve vaults, 2,783 linear feet of storm sewer (12-54"), 19 catch basins, 11 storm manholes (4-8-foot diameter), 630 linear feet of sanitary sewer to be repaired by CIPP, 7,638 square yards of pavement removal and replacement, 2,935 linear feet of curb and gutter removal and replacement, 5,692 square feet of sidewalk removal and replacement, and all other appurtenant work and materials necessary to complete the project.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents