Similar Projects
Last Updated | 04/02/2020 01:35 PM |
Project Title | Airport Gap Trail |
Physical Address | View project details and contacts |
City, State (County) | Orlando, FL 32802 (Orange County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $500,036 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contract will consist of the construction of a 12-foot wide shared use path on the east side of Maguire Boulevard from Livingston Street to 205 feet south of Colonial Drive (SR 50). Included in this work will be installation of pedestrian signals and reconstruction of the roadway at the intersection of Maguire Boulevard and Fairgreen Street. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |