Similar Projects
Water Treatment Services
Bidding

Deer Run Meadows Water Plant
Post-Bid
Richmond, TX 77406

Water Well No.1 Rework and Water Plant Improvements 2020
Post-Bid
$626,000 est. value
Richmond, TX 77406

Wastewater Treatment Plant Nos. 1 and 2 Improvements
Results
TX

Motor Control Improvements to Serve Water Plant No . 2
Results
TX

Restoration and Hazard Mitigation of the May Pumping Plant
Post-Bid
Less than $4,144,000 est. value
TX 77583

Capital Improvement Program Multiple Projects
Addition
Results
Sugar Land, TX

Water Plant Improvements
Post-Bid
Orchard, TX

Water Plant Improvements - 2019
Results
$103,000 est. value
Richmond, TX 77406

Water Plant No. 1 MCC Replacement and Improvements
Post-Bid
$570,000 est. value
Missouri City, TX 77459

Glendale Lakes Water Plant No. 1 Expansion No. 2
Results
Less than $1,925,000 est. value
TX

Water Treatment Plant to Serve City of Arcola
New Construction
Post-Bid
Arcola, TX

Granular Activated Carbon
Results
Less than $289,800 est. value
Sugar Land, TX

Water Plant No. 3 - Phase 3 Expansion
New Construction
Post-Bid
Katy, TX

Water Well No.1 And Water Plant No. 1, Phase 1
Results
TX

Last Updated 02/24/2020 04:37 AM
Project Title

Construction of Water Plant Nos. 2, 3, and 4 Analyzer Additions

Physical Address View project details and contacts
City, State (County) Stafford, TX 77477   (Fort Bend County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $847,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work, at all three water plants, includes construction of one (1) multi-sample, multi-parameter analyzer to be placed in a precast concrete building including foundation; plant piping; electrical, instruments, and control work; protective coatings; concrete pavement and sidewalks; site grading; hydro-mulch seeding; and all additional items shown on the construction plans or needed for completely functional water plants. The Project Site. The project is located in Fort Bend County WC&ID No. 2. The plant addresses are listed below. Water Plant No. 2: Sugar Grove Boulevard, Stafford, TX 77477 (Key Map 569-E) Water Plant No. 3: 12839 Frances St. A, Stafford, TX 77477 (Key Map 570-J) Water Plant No. 4: 503 Stafford Run Rd, Stafford, TX 77477 (Key Map 569-P).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Storm Drainage Structures, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents