Similar Projects
Bridport-Cornwall STP FPAV (45) and Bridport-Middlebury Hes Rmbl (5)
Bidding
$500,000 to $1,000,000 est. value
Bridport, Cornwall, Middlebury, VT

Georgia-St Albans Town STP FPAV (40)
Bidding
$2,500,000 to $5,000,000 est. value
Georgia, Saint Albans, VT

Colchester Avenue Sidepath Construction
Post-Bid
$250,000 to $500,000 est. value
Burlington, VT

CY 20 Street Reconstruction Program
Post-Bid
$1,300,000 to $1,500,000 est. value
Burlington, VT 05401

New Haven-Bristol PS19 (8)
Results
$1,000,000 to $2,500,000 est. value
Bristol, New Haven, VT 05443

Poker Hill Road Improvements – Segment C and D
Results
$380,320 est. value
Underhill, VT 05489

Paving
Post-Bid
Jamaica, VT 05343

Vergennes STP PC20 (1) and Bristol STP PC20 (2)
Results
$2,500,000 to $5,000,000 est. value
Bristol, Vergennes, VT 05491

Department of Public Safety Gate Alterations and Paving
Post-Bid
$50,000 est. value
Saint Albans, VT

Bituminous Concrete Crack Sealing
Results
Rutland, VT 05702

Cold Patch 2021
Post-Bid
Rutland, VT

Moretown STP PS20(1)
Results
$1,000,000 to $2,500,000 est. value
Moretown, VT 05660

MRGP Improvements - Coon Hill Road and Galvin Hill Road
Post-Bid
Colchester, VT

Spring 2020 Roadway Resurfacing
Results
Less than $300,000 est. value
Milton, VT

Green Mountain National Forest North Half Road Maintenance Services II
Post-Bid
Rutland, VT

Last Updated 04/05/2021 08:00 AM
Project Title

Johnson-Morristown STP 2919 (1) and Morristown STP 2920 (1) and Johnson STP 030-2 (35)

Physical Address View project details and contacts
City, State (County) Johnson, Morristown, VT   (Lamoille County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Locations: Johnson-Morristown Stp 2919 (1) - Beginning In The Town Of Johnson At Sta. j 232+7736 (Mm 4.409) And Extending Easterly Along Vt Route 15 For a Distance Of Approximately 50,198.25 Feet (9.506 Miles) To Sta. m 220+65.12 (Mm 4.179), And Beginning In The Town Of Morristown At Sta. 326+22.00 (Mm 6.178) And Extending Northerly Along Vt Route 100 For a Distance Of 2, 143.40 Feet (0.405 Miles) To Sta. 347+94.92 (Mm 6.590). Coarse-Milling, Reclaiming, Correcting Superelevation Deficiencies, Resurfacing With Intermediate And Wearing Courses, Pavement Markings, Guardrail, Drainage Improvements, And Other Highway Related Items. 201.10 0005 Clearing And Grubbing, Including Individual Trees And Stumps 1.000 Ls 201.31 0010 Thinning And Trimming For Signs 10.000 Each 203.15 0015 Common Excavation 17,725.000 Cy 203.16 0020 Solid Rock Excavation 2,000.000 Cy 203.30 0025 Earth Borrow 1,460.000 Cy 204.20 0030 Trench Excavation Of Earth 5,280.000 Cy 204.21 0035 Trench Excavation Of Rock 1,690.000 Cy 204.22 0040 Trench Excavation Of Earth, Exploratory (n.a.b.i.) 4.000 Cy 210.10 0045 Coarse-Milling, Bituminous Pavement 222,000.000 Sy 213.10 0050 Milled Rumble Strips (Centerline) 22,500.000 Lf 301.28 0055 Subbase Of Crushed Gravel, Fine Graded 45,050.000 Ton 301.35 0060 Subbase Of Dense Graded Crushed Stone 8,850.000 Cy 310.20 0065 Full Depth Reclamation (Fdr) 207,500.000 Sy 404.65 0070 Emulsified Asphalt 875.000 Cwt 406.28 0075 Air Voids Pay Adjustment (n.a.b.i.) 2.000 Lu 406.29 0080 Mat Density Pay Adjustment (n.a.b.i.) 2.000 Lu 406.30 0085 Surface Tolerance Pay Adjustment (n.a.b.i.) 2.000 Lu 406.31 0090 Longitudinal Joint Compaction Pay Adjustment (n.a.b.i.) 2.000 Lu 406.35 0095 Superpave Bituminous Concrete Pavement 56,100.000 Ton 406.38 0100 Hand-Placed Bituminous Concrete Material, Drives 6,260.000 Sy 406.45 0105 Bituminous Concrete Pavement Surface Preparation 100.000 Ton 406.50 0110 Price Adjustment, Asphalt Cement (n.a.b.i.) 2.000 Lu 410.10 0115 Material Transfer Vehicle 56,100.000 Ton 516.10 0120 Bridge Expansion Joint, Asphaltic Plug 120.000 Lf 525.10 0125 Removal Of Existing Bridge Railing 50.000 Lf 525.55 0130 Bridge Railing Repair, Type Ii 50.000 Lf 541.45 0135 Controlled Density (Flowable) Fill 20.000 Cy 580.20 0140 Rapid Setting Concrete Repair Material With Coarse Aggregate 100.000 Cf 601.0415 0145 18" Pccsp .064 (2-2/3 x 1/2) 13.000 Lf 601.0425 0150 24" Pccsp .064 (2-2/3 x 1/2) 7.000 Lf 601.0815 0155 18" Rcp Class Iii 6.000 Lf 601.995 0160 Cleaning Culvert Pipe, In-Place [0 To 24 In., Incl.] 1,455.000 Lf 604.40 0165 Changing Elevation Of Drop Inlets, Catch Basins, Or Manholes 16.000 Each 604.412 0170 Rehab. Drop Inlets, Catch Basins, Or Manholes, Class i 31.000 Each 604.415 0175 Rehab. Drop Inlets, Catch Basins, Or Manholes, Class Ii 4.000 Each 604.418 0180 Rehab. Drop Inlets, Catch Basins, Or Manholes, Class Iii 4.000 Each 604.42 0185 Changing Elevation Of Sewer Manholes 1.000 Each 605.10 0190 Underdrain Pipe, 6 Inches 22,720.000 Lf 608.15 0195 Power Grader Rental 80.000 Hr 608.25 0200 All Purpose Excavator Rental, Type i 585.000 Hr 608.26 0205 All Purpose Excavator Rental, Type Ii 60.000 Hr 608.30 0210 Power Broom Rental, Type i 60.000 Hr 608.37 0215 Truck Rental 1,170.000 Hr 608.40 0220 Loader Rental, Type i 60.000 Hr 609.15 0225 Dust And Ice Control With Calcium Chloride 115.000 Ton 613.10 0230 Stone Fill, Type i 1,305.000 Cy 613.11 0235 Stone Fill, Type Ii 350.000 Cy 616.20 0240 Granite Slope Edging 135.000 Lf 616.21 0245 Vertical Granite Curb 290.000 Lf 616.215 0250 Vertical Granite Curb, Mountable 25.000 Lf 616.28 0255 Cast-In-Place Concrete Curb, Type b 960.000 Lf 616.315 0260 Bituminous Concrete Curb, Type b 325.000 Lf 616.41 0265 Removal Of Existing Curb 1,710.000 Lf 616.47 0270 Bituminous Concrete Gutters And Traffic Islands 2.000 Ton 617.10 0275 Remove And Reset Mailbox, Single Support 32.000 Each 618.10 0280 Portland Cement Concrete Sidewalk, 5 Inch 110.000 Sy 618.30 0285 Detectable Warning Surface 40.000 Sf 619.17 0290 Yielding Marker Posts 75.000 Each 621.20 0295 Steel Beam Guardrail, Galvanized 5,600.000 Lf 621.205 0300 Steel Beam Guardrail, Galvanized w/8 Feet Posts 6,450.000 Lf 621.206 0305 Steel Beam Guardrail, Galvanized/Nested 210.000 Lf 621.21 0310 Hd Steel Beam Guardrail, Galvanized 160.000 Lf 621.60 0315 Anchor For Steel Beam Rail 56.000 Each 621.75 0320 Remove And Reset Guardrail 1,840.000 Lf 621.76 0325 Replace Guardrail Post Assembly 5.000 Each 621.77 0330 Replace Guardrail Beam Unit 3.000 Each 621.80 0335 Removal And Disposal Of Guardrail 12,350.000 Lf 629.20 0340 Adjust Elevation Of Valve Box 3.000 Each 630.10 0345 Uniformed Traffic Officers 4,300.000 Hr 630.15 0350 Flaggers 25,600.000 Hr 631.10 0355 Field Office, Engineers 1.000 Ls 631.16 0360 Testing Equipment, Concrete 1.000 Ls 631.17 0365 Testing Equipment, Bituminous 1.000 Ls 631.19 0370 Testing Equipment, Grout 1.000 Ls 631.26 0375 Field Office Communications (n.a.b.i.) 6,000.000 Dl 633.10 0380 Cpm Schedule 17.000 Each 634.10 0385 Employee Traineeship 520.000 Hr 635.11 0390 Mobilization/Demobilization (Stp 030-2(35)) 1.000 Ls 635.11 0395 Mobilization/Demobilization (Stp 2919(1) & Stp 2920(1)) 1.000 Ls 641.11 0400 Traffic Control, All-Inclusive (Stp 030-2(35)) 1.000 Ls 641.11 0405 Traffic Control, All-Inclusive (Stp 2919(1) & Stp 2920(1)) 1.000 Ls 641.15 0410 Portable Changeable Message Sign 7.000 Each 646.602 0415 Temporary 4 Inch White Line, Paint 401,000.000 Lf 646.612 0420 Temporary 4 Inch Yellow Line, Paint 426,700.000 Lf 646.642 0425 Temporary 8 Inch White Line, Paint 275.000 Lf 646.652 0430 Temporary 8 Inch Yellow Line, Paint 3,000.000 Lf 646.682 0435 Temporary 24 Inch Stop Bar, Paint 3,365.000 Lf 646.692 0440 Temporary Letter Or Symbol, Paint 816.000 Each 646.702 0445 Temporary Crosswalk Marking, Paint 1,165.000 Lf 646.76 0450 Line Striping Targets 54,200.000 Each 646.81 0455 Painted Curb 135.000 Lf 646.82 0460 Painted Island 385.000 Sf 649.11 0465 Geotextile For Roadbed Separator 33,000.000 Sy 651.15 0470 Seed 5,540.000 Lb 651.18 0475 Fertilizer 11,200.000 Lb 651.20 0480 Agricultural Limestone 47.000 Ton 651.35 0485 Topsoil 2,975.000 Cy 651.40 0490 Grubbing Material (2") 10,500.000 Sy 651.40 0495 Grubbing Material (6") 880.000 Sy 653.10 0500 Hay Mulch 46.000 Ton 653.20 0505 Rolled Erosion Control Product, Type i 4,640.000 Sy 653.21 0510 Rolled Erosion Control Product, Type Ii 2,600.000 Sy 653.25 0515 Check Dam, Type i 340.000 Cy 653.35 0520 Stabilized Construction Entrance 270.000 Cy 653.40 0525 Inlet Protection Device, Type i 32.000 Each 653.475 0530 Silt Fence, Type i 8,240.000 Lf 653.50 0535 Barrier Fence 5,940.000 Lf 653.55 0540 Project Demarcation Fence 50,220.000 Lf 653.60 0545 Erosion Log 8,890.000 Lf 675.20 0550 Traffic Sign, Type a 1,875.000 Sf 675.33 0555 Tubular Steel Sign Post 425.000 Lb 675.341 0560 Square Tube Sign Post And Anchor 4,500.000 Lf 675.35 0565 Soil Bearing Slip Base 8.000 Each 675.43 0570 Foundation For Tubular Steel Post 4.000 Each 675.50 0575 Removing Signs 425.000 Each 675.60 0580 Resetting Signs 12.000 Each 676.10 0585 Delineator With Steel Post 68.000 Each 676.12 0590 Removal Of Existing Delineator And Post 52.000 Each 678.15 0595 Traffic Control Signal System, Intersection (Historic Vt Route 100 & Northgate Plaza 1.000 Each 678.15 0600 Traffic Control Signal System, Intersection (Vt Route 15 & Historic Vt Route 100) 1.000 Each 678.23 0605 Wired Conduit (2") (Pvc) (Sch. 80) 1,789.000 Lf 678.23 0610 Wired Conduit (3") (Pvc) (Sch. 80) 1,000.000 Lf 678.30 0615 Electrical Conduit Sleeve (12") (Hdpe) 200.000 Lf 678.40 0620 Temporary Traffic Signal System 1.000 Each 678.45 0625 Removal Of Existing Traffic Control Signal System (Historic Vt Route 100 & Northgate Plaza 1.000 Each 678.45 0630 Removal Of Existing Traffic Control Signal System (Vt Route 15 & Historic Vt Route 100) 1.000 Each 679.24 0635 Remove Street Light Assembly 2.000 Each 679.47 0640 Bracket Arm 2.000 Each 679.50 0645 Luminaire 4.000 Each 690.50 0650 Price Adjustment, Fuel (n.a.b.i.) 2.000 Lu 900.620 0655 Special Provision (Coring Concrete) 17.000 Each 900.620 0660 Special Provision (Gnss Construction Inspection Equipment) 2.000 Each 900.620 0665 Special Provision (Junction Box, Heavy Duty) 5.000 Each 900.620 0670 Special Provision (Precast Reinforced Concrete Straight Headwall)(18") 3.000 Each 900.620 0675 Special Provision (Precast Reinforced Concrete Straight Headwall)(24") 1.000 Each 900.620 0680 Special Provision (Soil Nail Testing) 30.000 Each 900.640 0685 Special Provision (Barrier For Temporary Traffic Protection) 12,505.000 Lf 900.640 0690 Special Provision (Soil Nail) 11,000.000 Lf 900.645 0695 Special Provision (Dynamic Cone Penetrometer Testing) 1.000 Ls 900.645 0700 Special Provision (Gnss Construction Inspection Surface Models) 1.000 Ls 900.645 0705 Special Provision (Gnss Machine Control Grading) 1.000 Ls 900.670 0710 Special Provision (Slope Stabilization System, Wire Mesh Facing) 13,500.000 Sf 900.675 0715 Special Provision (Full Depth Reclamation, Emulsified Asphalt) 207,500.000 Sy 900.680 0720 Special Provision (Portland Cement For Full Depth Reclamation, Emulsified Asphalt) 675.000 Ton 900.683 0725 Special Provision (Emulsified Asphalt For Full Depth Reclamation) 81,300.000 Cwt 402.12 Aa1 0730 Aggregate Shoulders 2,690.000 Ton 402.13 Aa2 0735 Aggregate Shoulders, Rap 2,690.000 Ton 646.402 Bb1 0740 Durable 4 Inch White Line, Thermoplastic 123,600.000 Lf 646.403 Bb2 0745 Durable 4 Inch White Line, Epoxy Paint 123,600.000 Lf 646.404 Bb3 0750 Durable 4 Inch White Line, Polyurea 123,600.000 Lf 646.412 Cc1 0755 Durable 4 Inch Yellow Line, Thermoplastic 15,300.000 Lf 646.413 Cc1 0760 Durable 4 Inch Yellow Line, Epoxy Paint 130,000.000 Lf 646.413 Cc2 0765 Durable 4 Inch Yellow Line, Epoxy Paint 15,300.000 Lf 646.414 Cc2 0770 Durable 4 Inch Yellow Line, Polyurea 130,000.000 Lf 646.414 Cc3 0775 Durable 4 Inch Yellow Line, Polyurea 15,300.000 Lf 646.442 Dd1 0780 Durable 8 Inch White Line, Thermoplastic 95.000 Lf 646.482 Dd1 0785 Durable 24 Inch Stop Bar, Thermoplastic 45.000 Lf 646.443 Dd2 0790 Durable 8 Inch White Line, Epoxy Paint 95.000 Lf 646.483 Dd2 0795 Durable 24 Inch Stop Bar, Epoxy Paint 45.000 Lf 646.444 Dd3 0800 Durable 8 Inch White Line, Polyurea 95.000 Lf 646.484 Dd3 0805 Durable 24 Inch Stop Bar, Polyurea 45.000 Lf 646.452 Ee1 0810 Durable 8 Inch Yellow Line, Thermoplastic 800.000 Lf 646.492 Ee1 0815 Durable Letter Or Symbol, Thermoplastic 29.000 Each 646.453 Ee2 0820 Durable 8 Inch Yellow Line, Epoxy Paint 800.000 Lf 646.493 Ee2 0825 Durable Letter Or Symbol, Epoxy Paint 29.000 Each 646.454 Ee3 0830 Durable 8 Inch Yellow Line, Polyurea 800.000 Lf 646.494 Ee3 0835 Durable Letter Or Symbol, Polyurea 29.000 Each 646.482 Ff1 0840 Durable 24 Inch Stop Bar, Thermoplastic 890.000 Lf 646.483 Ff2 0845 Durable 24 Inch Stop Bar, Epoxy Paint 890.000 Lf 646.484 Ff3 0850 Durable 24 Inch Stop Bar, Polyurea 890.000 Lf 646.492 Gg1 0855 Durable Letter Or Symbol, Thermoplastic 214.000 Each 646.493 Gg2 0860 Durable Letter Or Symbol, Epoxy Paint 214.000 Each 646.494 Gg3 0865 Durable Letter Or Symbol, Polyurea 214.000 Each 646.503 Hh1 0870 Durable Crosswalk Marking, Epoxy Paint 315.000 Lf 646.504 Hh2 0875 Durable Crosswalk Marking, Polyurea 315.000 Lf

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents