Similar Projects
Yorkshire Subdivision
New Construction, Infrastructure
Conception
$6,260,000 CJ est. value
Reno, NV 89501

City Hall - Southeast ADA Ramp Improvements - Construction - City of Sparks
Infrastructure
Conception
$250,000 CJ est. value
Sparks, NV 89431

The Park at McCarran Mixed Use Development / Reno
New Construction, Infrastructure - 1,165,000 SF
Design
$18,000,000 CJ est. value
Reno, NV 89502

RFQ Construction Manager at Risk - NV Cares Campus Improvements
Infrastructure
Design
$9,300,000 CJ est. value
Reno, NV 89512

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Construct Classroom at Main Station Farm
New Construction, Infrastructure - 6,000 SF
Bidding
$4,038,319 CJ est. value
Reno, NV 89502

Development of Airport Site for Air Cargo Facilities
Infrastructure
Post-Bid
Reno, NV 89502

University of Nevada Reno - Mathewson University Gateway Development Phase I
New Construction, Infrastructure - 125,000 SF
Post-Bid
$2,000,000 CJ est. value
Reno, NV 89557

Lake - Replace Meters & Backflow Preventers
Infrastructure
Results

Thoma-Yori Water Main Replacement
Infrastructure
Results
$332,100 to $405,900 est. value
Reno, NV

Reno-Tahoe International Airport Master Plan Expansion (More RNO Project) - Ticketing Hall and Lobby Expansion
Addition, Demolition, Renovation, Infrastructure
Construction
$32,000,000 CJ est. value
Reno, NV 89502

Quick Quack Car Wash / Reno
New Construction, Infrastructure - 3,597 SF
Pending Verification
$800,000 CJ est. value
Reno, NV 89506

North Sierra Street Mixed Use
Infrastructure, Renovation
Pending Verification
$6,500,000 CJ est. value
Reno, NV 89501

Maintenance Garage - West Side Parking Lot Rehabilitation - City of Sparks
Infrastructure
Conception
$250,000 CJ est. value
Sparks, NV 89431

Panera Bread - The Crossing at Meadowood Square / Reno
Demolition, Infrastructure, Build-out - 3,650 SF
Design
$1,000,000 CJ est. value
Reno, NV 89511

Last Updated 02/18/2023 12:04 AM
Project Title

Crystal Peak Distribution Watermain Improvements

Physical Address View project details and contacts
City, State (County) Incline Village, NV 89451   (Washoe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,111,111 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Any questions concerning this Project should be directed to the IVGID Engineering office at 775-832-1267. Last day for questions will be February 2, 2023 by 3:00 p.m. The Project includes the following Work: Bid Schedule Crystal Peak Distribution Watermain Improvements: Installation of approximately 2,280 LF of 8 DR-14 PVC or Class 350 DIP water main in Washoe Co. ROW. Connection to (E) 8 water main in Washoe Co. ROW. Re-connect existing domestic service lines. Construct three (3) new fire hydrant assemblies. Construct one (1) combination air valve. The Work also includes: Abandonment of specified lines and valves, traffic control, maintain residential and business driveway access, erosion & sediment controls, pavement restoration, replacement of existing features, including vegetation, concrete, and other utilities removed and/or damaged by construction activity, acquisition of Washoe County street cut permits and all related appurtenances; compliance with County permit conditions and working within Right of Ways in Incline Village, Washoe County, Nevada. The Engineers Estimate for this project is $1,200,000. The Project has a total duration of 110 calendar days. This is a Prevailing Wage project. In accordance with the provisions of NRS 338, the IVGID Board of Trustees has ascertained from the Labor Commissioner the general prevailing wage in the locality of the District for each craft and type of workman, and the CONTRACT will contain in express terms the hourly and daily rate of such prevailing wage. The PWP number for this project is WA-2023-032. No proposal will be accepted from a Contractor who is not licensed in accordance with the laws of this State to perform the work herein described. IVGID reserves the right to reject any or all bids pursuant to Nevada Law; to award a contract for less than all the work if funds now available are insufficient for completion of the total project; to waive any informalities or irregularities therein; and/or to award the bid to the lowest responsible bidder.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents