Last Updated 04/21/2021 02:48 PM
Project Title

FY 21/22 Master Stormwater Management Plan Project 26

Physical Address View project details and contacts
City, State (County) Northbrook, IL   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Storm Sewer Removal and Installation, Drainage Structure Removal and Installation, Grading and Shaping Of Ditches, Concrete Sidewalk Removal and Replacement, Hot-Mix Asphalt Pavement Patching and Landscape Restoration on Cedar Court, Floral Drive, Holly Court, Landwehr Road and Sunset Trail In The Village Of Northbrook, Illinois.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents