Similar Projects
Reported | 03/18/2022 12:00 AM |
Project Title | Electric Vehicle Charging Station and Transformer Installation |
Physical Address | View project details and contacts |
City, State (County) | Centennial, CO 80112 (Arapahoe County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To install and activate one Level-II dual-port pedestal mounted CPF50 Charge point electric vehicle charging station. The City will also require an additional breaker installed in the electrical panel and a transformer to support the charging station. The location of the EV charging station will be in the City of Centennial Public Works Yard at 7272 S. Eagle St. Centennial, CO 80112 and will be for City and City contractor fleet vehicle use. The City will purchase the charging station prior to install. The selected vendor will be responsible for transportation of the station to the Public Works Yard from the Charge point warehouse located in the Denver metro area. Boring and/or trenching from the electric panel to the site of station, including concrete and/or asphalt patching, will be the responsibility of the selected vendor. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |