Similar Projects
Robert Road Improvements - City of Prescott Valley
Infrastructure
Conception
$500,000 CJ est. value
Prescott Valley, AZ 86314

Concession Stand - Posse Grounds Park - PR-01 - City of Sedona
New Construction, Infrastructure
Conception
$559,000 CJ est. value
Sedona, AZ 86336

Fire Drill Ground Improvements - 17001 - City of Prescott
Demolition, New Construction, Infrastructure
Design
$3,487,427 CJ est. value
Prescott, AZ 86303

Bell Rock Trail Water Storage Tank
New Construction, Infrastructure - 2,350 SF
Design
$2,000,000 CJ est. value
Sedona, AZ 86336

SR 179 Pedestrian Crossing at Oak Creek
Infrastructure
Bidding
$6,432,603 CJ est. value
Sedona, AZ 86351

RFP A/E - Plans & Specs - Drilling a Ground Water Well in Ashfork
Infrastructure
Bidding
$750,000 CJ est. value
Ash Fork, AZ 86320

Sedona Airport Infield RSA Drainage Improvements (Phase 1)
Infrastructure
Post-Bid
$850,699 CJ est. value
Sedona, AZ 86336

Community Resource Building Walkway and Service Access Drive Addition
Infrastructure
Post-Bid
Prescott, AZ

Starlight Drive Pedestrian and Drainage Improvement Project
Infrastructure
Results
$1,496,304 CJ est. value
Prescott Valley, AZ 86314

Taxiway C Relocation and Hot Spot Mitigation Phase 3
Infrastructure
Results
$7,194,000 CJ est. value
Prescott, AZ 86301

Unisource Energy Services
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Cottonwood, AZ 86326

San Cipriano Apartments
New Construction, Infrastructure
Pending Verification
$17,000,000 CJ est. value
Cottonwood, AZ 86326

East Cherry Street Warehouse
New Construction, Infrastructure - 12,600 SF
Pending Verification
$1,000,000 CJ est. value
Cottonwood, AZ 86326

Mountain Valley Park Pavilion Synthetic Field Resurface - City of Prescott Valley
Infrastructure
Conception
$725,000 CJ est. value
Prescott Valley, AZ 86314

SundogTrunk Main, Phase C - City of Prescott
Infrastructure
Design
$8,210,957 CJ est. value
Prescott, AZ 86301

Last Updated 03/22/2023 10:34 AM
Project Title

FrameTec Manufacturing Facility

Physical Address View project details and contacts
City, State (County) Camp Verde, AZ 86322   (Yavapai County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction began in December 2022. Information regarding a general contractor has not been provided. It is expected to be completed in spring 2024.

Details

110,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents