Similar Projects
Last Updated | 07/20/2020 10:41 AM |
Project Title | Construction Management and Inspection Services |
Physical Address | View project details and contacts |
City, State (County) | Trappe, MD 21673 (Talbot County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering, Inspection Services |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Town’s construction of the Trappe Well Addition, consisting of, but not limited to, the construction/installation of the following: one (1) new 8-inch production well (Well #6), well pump, associated piping and electrical appurtenances, capable of producing a minimum of 170 gpm, construction of a new Water Plant building to house updated electrical controls, chemical feed systems and all associated appurtenances, installation of new Sodium Hypochlorite chemical pump equipment and associated appurtenances, removal of existing gas chlorine cylinders, installation of new electrical controls and SCADA system, miscellaneous modifications to existing water piping and associated valves and equipment, and related yard piping and sitework (the “Project”). The Project was designed by George, Miles & Buhr, LLC (“GMB”) and has received loan funding from the Maryland Department of the Environment (“MDE”) under the Drinking Water State Revolving Fund (“DWSRF”). |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |