Similar Projects
New Lake Kickapoo Pump Station - City of Wichita Falls
Demolition, New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Wichita Falls, TX 76301

Castaway Cove Park Trail - City of Wichita Falls
Infrastructure
Conception
$400,000 CJ est. value
Wichita Falls, TX 76301

Foundation Automotive, CDR+J Showroom Renovation
New Construction, Addition - 3,674 SF
Design
$395,000 est. value
Wichita Falls, TX 76302

Bath & Body Works / Quail Creek Crossing
Renovation - 4,243 SF
Design
$215,000 CJ est. value
Wichita Falls, TX 76308

Full Depth Concrete Repair
Infrastructure
Bidding
$1,472,330 CJ est. value
Wichita Falls, TX 76308

B992 Oil Storage Tank
Infrastructure
Bidding
$250,000 CJ est. value
Sheppard AFB, TX 76311

Bolin Hall Expansion and Renovation - Midwestern State University
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$29,000,000 CJ est. value
Wichita Falls, TX 76310

AAA Cooper Renovation
Renovation - 24,748 SF
Post-Bid
$250,000 CJ est. value
Wichita Falls, TX 76301

US-287 - Traffic Control Services
Infrastructure
Results
$400,000 est. value
Wichita Falls, TX 76303

Resurface Roadway - FM 2380
Infrastructure
Results
$7,479,604 CJ est. value
Wichita Falls, TX 76308

QuikTrip #7907 / Wichita Falls
New Construction, Infrastructure
Construction
$850,000 CJ est. value
Wichita Falls, TX 76306

QuikTrip #7907 / Wichita Falls
New Construction, Infrastructure
Construction
$850,000 CJ est. value
Wichita Falls, TX 76306

Church of the Good Shepherd Parish Hall
Addition, Demolition, Infrastructure - 315 SF
Pending Verification
$300,000 CJ est. value
Wichita Falls, TX 76301

Water System Improvements / City of Wichita Falls
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Wichita Falls, TX 76301

Lake Wichita Land Acquisition Near Boat Ramp - City of Wichita Falls
Infrastructure
Conception
$2,070,000 CJ est. value
Wichita Falls, TX 76308

Last Updated 07/26/2023 11:08 AM
Project Title

Caliber Collision / Wichita Falls

Physical Address View project details and contacts
City, State (County) Wichita Falls, TX 76306   (Wichita County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Office, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for an auto repair facility. *This project is being bid by invitation only. If you have been contacted by the owner to bid on this project as a general contractor, and would like to be listed below, please notify our editorial staff. *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff.

Details

17,608 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents