Similar Projects
Lucky Star Wind Farm
New Construction, Infrastructure
Conception
$650,000,000 CJ est. value
Medicine Bow, WY 82329

Street Reconstruction - Pierce/Curtis Intersection - MCW-CP24-010 - City of Laramie
Infrastructure
Conception
$485,000 CJ est. value
Laramie, WY 82070

Two Rivers North Wind Farm
New Construction, Infrastructure
Design
$540,000,000 CJ est. value
Medicine Bow, WY 82329

Laramie Valley Chapel
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Laramie, WY 82070

7th Street Water Main Replacement Project
Infrastructure
Bidding
$850,000 CJ est. value
Gillette, WY 82716

2023 Jenne Trail Paving Project
Infrastructure
Bidding
$200,000 CJ est. value
Douglas, WY 82633

RFQ D/B - DETO 228872 Replace Obsolete Housing Unit with Multiple Unit Devil Tower Nation
Demolition, New Construction, Infrastructure - 3,856 SF
Post-Bid
$5,000,000 CJ est. value
Devils Tower, WY 82714

Annual Trenching and Boring Services
Term Contract
Post-Bid
Gillette, WY

Reynolds Sanitary Sewer - Phase 2
Infrastructure
Results
$543,826 CJ est. value
Laramie, WY 82072

North Tank and Pipeline Project
Infrastructure
Results
$18,148,591 CJ est. value
Laramie, WY 82070

U-Haul of Gillette
New Construction, Infrastructure - 38,264 SF
Pending Verification
$4,000,000 CJ est. value
Gillette, WY 82718

Dollar General / Douglas
New Construction, Infrastructure - 10,542 SF
Pending Verification
$3,000,000 CJ est. value
Douglas, WY 82633

Street Rehabilitation - Joanna Bruner - MCW-CP24-011 - City of Laramie
Infrastructure
Conception
$780,000 CJ est. value
Laramie, WY 82072

Garland - Byron (Sidon Canal Section)
Infrastructure
Bidding
$400,000 CJ est. value
Greybull, WY 82426

University of Wyoming Halls and Dining - Subcontractors and Suppliers
New Construction, Infrastructure, Renovation
Post-Bid
$170,000,000 CJ est. value
Laramie, WY 82070

Last Updated 01/25/2023 05:18 AM
Project Title

Bear River Administrative Site

Physical Address View project details and contacts
City, State (County) Evanston, WY 82930   (Uinta County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status No longer Accepting Requests, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This is a Combined Synopsis Solicitation Notice. Proposals are being solicited by the USDA, Forest Service for the Bear River Administrative Site Well Construction project. The purpose of this contract is to drill a new potable water well at the Bear River Administrative Site. The work for this contract includes all labor, materials, supplies, and equipment to complete the project. The solicitation and all attachments are being posted. Project Location: Bear River Administrative Site on the Evanston Ranger District of the Uinta-Wasatch-Cache National Forest, Summit County, Utah. The project is located approximately 32 miles by road south of Evanston, Wyoming. The project can be accessed from Interstate 80 and Highway 150. GPS: 40.884215, -110.831032 Approximate elevation: 8500' In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $100,000 and $250,000. Contractors are required to be actively registered with the System for Award Management (SAM) https://www.sam.gov prior to submitting a proposal and to be considered for award. Registering in the SAM system is FREE. If you need assistance, please be sure to reach out your local Procurement Technical Assistance Center (PTAC) representative. PTAC is a FREE resource to all small business and your state representative's contact information can be found at the following website: https://www.aptac-us.org/. All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. All responsible sources may submit a response to this announcement which will be considered by this agency. Period of Performance: 06/01/2023 to 10/31/2023 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents