Similar Projects
Bailey Hall Unit Ventilator Replacements Project
Alteration
Bidding
Gorham, ME

Design - Build Noise Controls for a Trane Screw Chiller
Post-Bid
South Portland, ME

Replacement of 154 Existing PTAC Units
Post-Bid
Brunswick, ME 04011

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Design/Build of Sheds and Roofs at Public Works Facility
Results
New Gloucester, ME 04260

HVAC Service
Term Contract
Post-Bid
Brunswick, ME 04011

Portland Exposition Building Roof Replacement
Results
Less than $200,000 est. value
Portland, ME 04102

Edward T. Gignoux Federal Courthouse HVAC and Fire Alarm Upgrade
Post-Bid
$15,000,000 to $20,000,000 est. value
Portland, ME 04101

Re-Roofing of a 100 Unit, 2-Story Building at St. Cyr Court
Results
South Portland, ME 04106

Heat Pump Installation
Post-Bid
South Portland, ME

Annual Air Compressor Maintenance for Air National Guard Facilities
Results
Bangor, South Portland, ME

Roofing MACC
Post-Bid

SJC HVAC Upgrades at the Cumberland County Courthouse
Results
Less than $200,000 est. value
Portland, ME 04101

HVAC Construction
Post-Bid
Portland, ME

250 Canco Road Roof Replacement - Phase II
Results
Less than $175,000 est. value
Portland, ME

Reported 07/09/2021 12:00 AM
Project Title

Coffin Elementary Ventilation Improvements and Roof Reinforcement

Physical Address View project details and contacts
City, State (County) Brunswick, ME 04011   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC, Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $235,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of removing an existing ERV and associated ductwork from the ceiling structure at Coffin Elementary School cafeteria , placing a new ERV and associated ductwork on the roof of the cafeteria, reinforcing the roof trusses below the ERV and associated cutting and patching. The work must be completed during summer vacation for the school district.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents