Similar Projects
2022 Bond Construction & Renovations
New Construction
Conception
$1,200,000,000 est. value
San Antonio, TX

Texas A&M San Antonio New TDEM Facility
New Construction
Conception
San Antonio, TX 78224

Burbank High School - 2020 Bond - Category 2 - San Antonio Independent School District (SAISD)
New Construction, Renovation, Infrastructure
Design
$19,318,760 CJ est. value
San Antonio, TX 78205

SOFTBALL FIELD UPGRADE
Infrastructure
Design
$300,000 CJ est. value
San Antonio, TX 78224

Hill Country High School
New Construction, Infrastructure - 64,000 SF
Bidding
$22,000,000 CJ est. value
San Antonio, TX 78254

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

CMAR - New Precinct 4 Facility
New Construction
Post-Bid
$11,600,000 est. value
Converse, TX 78109

Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract For Construction, Repair, And Alteration With Design-Build And Incidental Abatement For Gsa/Pbs Region 7
Renovation
Results
$2,000 to $3,500,000 est. value

Vida San Antonio Phase 1A Subdivision & Vida San Antonio Phase 1B Subdivision
Results
San Antonio, TX 78200

Waters Edge I / Building A
New Construction, Infrastructure - 105,702 SF
Construction
$18,600,000 CJ est. value
San Antonio, TX 78235

Shaenfield Business Park
New Construction, Infrastructure - 44,000 SF
Construction
$4,400,000 CJ est. value
San Antonio, TX 78254

Alamo Visitor Center and Museum
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
San Antonio, TX 78205

Nicha's Comida Mexicana
New Construction, Infrastructure - 7,805 SF
Pending Verification
$2,000,000 CJ est. value
San Antonio, TX 78214

Clark High School - Fine Arts Replacement- 2022 Bond - Northside Independent School District
New Construction, Renovation, Infrastructure
Conception
$56,900,000 CJ est. value
San Antonio, TX 78249

RCCG Salvation Center San Antonio / 1406 Pinn Road
New Construction, Infrastructure - 30,700 SF
Design
$2,500,000 CJ est. value
San Antonio, TX 78227

Last Updated 02/07/2023 05:52 PM
Project Title

Package 2 SAWS NE Operation Center and NE Service Center

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78205   (Bexar County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 1, 2022, construction is underway and expected to be completed August 6, 2024. No further inquiries to be accepted. GUIDO CONSTRUCTION Design Build Contractor will be accepting Competitive The proposal package shall demonstrate the Offeror's ability to deliver the "best value". All subcontractors, especially certified HUB and SMWVBE firms, are encouraged to bid. Construction components include: Structural & Site Concrete, Masonry, Structural Steel, Millwork, Moisture Protection, Overhead & Sectional Doors, Doors, Frames, Hardware, Storefronts & Glazing, Gypsum Board & Assemblies, Polished Concrete & Sealed Concrete, Finishing, Tiling, Resilient Flooring, Carpet, Painting, Signage. Specialties, Partitions, Window Shades, Fire Sprinkler, Plumbing, HVAC, Electrical, Communications, Fire Alarm, Access Controls, Surveillance, Landscape. *This project has been awarded and all trades have been let.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents